29.10.2014 Views

PDF File - GEC

PDF File - GEC

PDF File - GEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(RMUs) 18 previously issued by that Party and held in its national registry [Decision 13/CMP.1,<br />

Annex, para. 29]. Since an AAU or RMU shall be converted into an ERU by adding a project<br />

identifier to the serial number and changing the type indicator in the serial number to indicate<br />

an ERU, it can be supposed that ERUs from JI LULUCF projects would be converted from RMUs.<br />

It has been decided that ERUs that have been converted from RMUs cannot be carried over<br />

to subsequent commitment periods [Decision 13/CMP.1, Annex, para. 15(a)]. Consequently, it<br />

would not be possible to carry over ERUs originating from JI LULUCF projects to subsequent<br />

commitment periods.<br />

(b) In case of net GHG emissions resulting from its activities under Article 3, paragraph 3, and its<br />

elected activities under Article 3, paragraph 4, each Party included in Annex I shall cancel CERs,<br />

ERUs, AAUs and/or RMUs equivalent to such net emissions [Decision 13/CMP.1, Annex, para.<br />

32]. This indicates that in case of reversal, the host Party is primarily responsible for replacing<br />

that amount in the formal UNFCCC procedures.<br />

4.5.2. JI LULUCF PDD<br />

JISC04 approved the JI LULUCF PDD form [JISC04, Annex 14], which later on was adopted by the COP/<br />

MOP2 in accordance with the JI guidelines [Decision 2/CMP.2, Para 3]. The structure of the JI LULUCF<br />

PDD is almost the same as that of JI PDD, with some modifications, insertions, and deletion along<br />

with adjustments to keep the conformity to LULUCF activities. The JI LULUCF PDD form (Version 01)<br />

and the guidelines for users of the JI LULUCF PDD form (Version 02) are available at: http://ji.unfccc.<br />

int/Ref/Docs.html. Table 4-4 shows the comparison of contents of JI LULUCF PDD, JI-PDD, and CDM-<br />

AR-PDD.<br />

Table 4-4 Comparison of JI LULUCF PDD version 01, JI PDD version 01, and CDM-AR-PDD version 03<br />

JI-PDD version 01 JI LULUCF PDD version 01 CDM-AR-PDD version 03<br />

A. General description of the<br />

project<br />

A. General description of the<br />

LULUCF project<br />

A. General description of the<br />

proposed A/R CDM project activity<br />

B. Baseline B. Baseline B. Duration of the project activity/<br />

crediting period<br />

C. Duration of the project/<br />

crediting period<br />

C. Duration of the LULUCF project/<br />

crediting period<br />

C. Application of an approved<br />

baseline and monitoring<br />

methodology<br />

D. Monitoring plan D. Monitoring plan D. Estimation of ex ante net<br />

anthropogenic GHG removals by<br />

sinks and estimated amount of<br />

net anthropogenic GHG removals<br />

by sinks over the chosen crediting<br />

period<br />

E. Estimation of greenhouse gas<br />

emission reductions<br />

E. Estimation of enhancements of<br />

net anthropogenic removals by<br />

sinks<br />

E. Monitoring plan<br />

F. Environmental impacts F. Environmental impacts F. Environmental impacts of the<br />

proposed A/R CDM project activity<br />

G. Stakeholders’ comments G. Stakeholders’ comments G. Socio-economic impacts of the<br />

proposed A/R CDM project activity<br />

H. Stakeholders’ comments<br />

82<br />

18 Total amount of RMUs of an Annex I Party is calculated from net removal of GHGs by A/R activities and additional activities<br />

related to GHG removals by sinks

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!