7. List of Guidance<br />

Table A-15 List of Guidance (as of 30 Oct 08)<br />

Project Design Documents (PDDs)<br />

Guidelines Project Design Document (CDM-PDD) and the Proposed new baseline and monitoring<br />

methodologies (CDM-NM)<br />

Guidelines for completing the project design document for A/R (CDM-AR-PDD), the proposed new<br />

methodology for A/R: baseline and monitoring (CDM-AR-NM)<br />

Simplified Project Design document (CDM-SSC-PDD) and the form for proposed new Small Scale<br />

Methodologies (CDM-SSC-NM)<br />

Guidelines for completing the form for submission of bundled Small-Scale CDM project activities (F-CDM-<br />

SSC-BUNDLE)<br />

Simplified PDD for SSC-AR (CDM-SSC-AR-PDD) and submissions on methodologies for SSC-AR CDM project<br />

activities (F-CDM-SSC-AR-Subm)<br />

Accreditation<br />

Handbook of Accreditation of Operational Entities by the Executive Board of the CDM<br />

Change of the scope of witnessing of applicant entities for accreditation<br />

Guidelines for the Preparation of the Annual Activity Report by a DOE to the Executive Board of the CDM<br />

Guidance on programme of activities<br />

Programme of Activities (PoA)<br />

Payment of a registration fee for a programme of activities (PoA)<br />

Eligibility of activities under the CDM<br />

Guidance for determining the occurrence of de-bundling under a programme of activities (PoA)<br />

Guidance on the registration of a programme of activities as a single CDM project activity<br />

Guidance on accounting eligible HFC-23<br />

Methodology - Large Scale<br />

Guidance related to the submission of methodologies for substitution, recycling, recovery and destruction<br />

of SF 6<br />

Eligibility of project activities that produce products whose consumption leads to emission reductions<br />

Guidance on programme of activities<br />

Eligibility of hydroelectric power plants with reservoirs as CDM project activities<br />

Estimating emissions reductions related to fuels savings from project activities that primarily improve<br />

combustion efficiency of fuels<br />

Guidance related to use of additionality tool<br />

Guidance related to determination of permitted operation conditions (AM0034)<br />

Registration of project activities under a programme of activities as a single CDM project activity<br />

Criteria for consolidations and revision of methodologies<br />

Further clarification of the application of para. 93 of the 25 meeting of the Board<br />

Double-counting in CDM project activities using blended biofuel for energy use<br />

Avoiding double counting of emission sources<br />

Guidance on bunker fuels<br />

Guidance on IPCC default values<br />

Guidance related to calibration (monitoring) requirements<br />

Guidance related to monitoring requirements<br />

Guidance related to avoided methane estimations<br />