PDF File - GEC
PDF File - GEC
PDF File - GEC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7. List of Guidance<br />
Table A-15 List of Guidance (as of 30 Oct 08)<br />
Project Design Documents (PDDs)<br />
Guidelines Project Design Document (CDM-PDD) and the Proposed new baseline and monitoring<br />
methodologies (CDM-NM)<br />
Guidelines for completing the project design document for A/R (CDM-AR-PDD), the proposed new<br />
methodology for A/R: baseline and monitoring (CDM-AR-NM)<br />
Simplified Project Design document (CDM-SSC-PDD) and the form for proposed new Small Scale<br />
Methodologies (CDM-SSC-NM)<br />
Guidelines for completing the form for submission of bundled Small-Scale CDM project activities (F-CDM-<br />
SSC-BUNDLE)<br />
Simplified PDD for SSC-AR (CDM-SSC-AR-PDD) and submissions on methodologies for SSC-AR CDM project<br />
activities (F-CDM-SSC-AR-Subm)<br />
Accreditation<br />
Handbook of Accreditation of Operational Entities by the Executive Board of the CDM<br />
Change of the scope of witnessing of applicant entities for accreditation<br />
Guidelines for the Preparation of the Annual Activity Report by a DOE to the Executive Board of the CDM<br />
Guidance on programme of activities<br />
Programme of Activities (PoA)<br />
Payment of a registration fee for a programme of activities (PoA)<br />
Eligibility of activities under the CDM<br />
Guidance for determining the occurrence of de-bundling under a programme of activities (PoA)<br />
Guidance on the registration of a programme of activities as a single CDM project activity<br />
Guidance on accounting eligible HFC-23<br />
Methodology - Large Scale<br />
Guidance related to the submission of methodologies for substitution, recycling, recovery and destruction<br />
of SF 6<br />
Eligibility of project activities that produce products whose consumption leads to emission reductions<br />
Guidance on programme of activities<br />
Eligibility of hydroelectric power plants with reservoirs as CDM project activities<br />
Estimating emissions reductions related to fuels savings from project activities that primarily improve<br />
combustion efficiency of fuels<br />
Guidance related to use of additionality tool<br />
Guidance related to determination of permitted operation conditions (AM0034)<br />
Registration of project activities under a programme of activities as a single CDM project activity<br />
Criteria for consolidations and revision of methodologies<br />
Further clarification of the application of para. 93 of the 25 meeting of the Board<br />
Double-counting in CDM project activities using blended biofuel for energy use<br />
Avoiding double counting of emission sources<br />
Guidance on bunker fuels<br />
Guidance on IPCC default values<br />
Guidance related to calibration (monitoring) requirements<br />
Guidance related to monitoring requirements<br />
Guidance related to avoided methane estimations<br />
117