In order to host an A/R CDM project activity, a non-Annex I Party needs to determine thresholds for<br />

forest definition in addition to the participation requirements mentioned above, and report to the EB<br />

through its DNA. The thresholds are:<br />

(a) A single minimum tree crown cover value between 10 and 30 per cent;<br />

(b) A single minimum land area value between 0.05 and 1 hectare; and<br />

(c) A single minimum tree height value between 2 and 5 metres.<br />

(a) Tree crown cover: 10 - 30 %<br />

~<br />

10 % 30 %<br />

(b) Land area value: 0.05 - 1ha<br />

~<br />

0.05 ha<br />

1.0 ha<br />

(c) Tree height: 2 - 5 m<br />

2 m<br />

~<br />

5 m<br />

Figure 2-5 Thresholds for forest definition<br />

2.4.3 Project cycle of A/R CDM project activities<br />

The project cycle and approval process of A/R CDM project activities is similar to that of emission<br />

reduction CDM project activities, as outlined in Figure 1-4 and Figure 1-5, respectively. Project<br />

participants need to check whether their A/R CDM project activity is a large scale A/R CDM project<br />

activity or a small scale A/R CDM project activity (see section 2.4.5 for definition of small scale A/R<br />

CDM project activity), and whether an approved methodology is applicable. Then they need to<br />

proceed with drafting of a CDM-AR-PDD, submission of a new methodology if necessary, validation,<br />

and registration for issuance of credits (in case of A/R CDM project activities, tCERs and lCERs are<br />

issued).<br />

2.4.4 Overview of approval process of A/R CDM project activities and A/R<br />

CDM methodologies<br />

As described in Chapter 1 (Figure 1-5), the basic steps of approval process of A/R CDM project<br />

activities are the same as emission reduction CDM project activities. In this section, brief explanation<br />

of the approval process is given in a step-by-step manner.<br />

Step 1: Determine if your project qualifies as a small scale A/R CDM project activity<br />

Project participants should first consider if their project meets the eligibility criteria of small scale A/R<br />

CDM project activities as listed below.<br />

37