In order to host an A/R CDM project activity, a non-Annex I Party needs to determine thresholds for<br />
forest definition in addition to the participation requirements mentioned above, and report to the EB<br />
through its DNA. The thresholds are:<br />
(a) A single minimum tree crown cover value between 10 and 30 per cent;<br />
(b) A single minimum land area value between 0.05 and 1 hectare; and<br />
(c) A single minimum tree height value between 2 and 5 metres.<br />
(a) Tree crown cover: 10 - 30 %<br />
~<br />
10 % 30 %<br />
(b) Land area value: 0.05 - 1ha<br />
~<br />
0.05 ha<br />
1.0 ha<br />
(c) Tree height: 2 - 5 m<br />
2 m<br />
~<br />
5 m<br />
Figure 2-5 Thresholds for forest definition<br />
2.4.3 Project cycle of A/R CDM project activities<br />
The project cycle and approval process of A/R CDM project activities is similar to that of emission<br />
reduction CDM project activities, as outlined in Figure 1-4 and Figure 1-5, respectively. Project<br />
participants need to check whether their A/R CDM project activity is a large scale A/R CDM project<br />
activity or a small scale A/R CDM project activity (see section 2.4.5 for definition of small scale A/R<br />
CDM project activity), and whether an approved methodology is applicable. Then they need to<br />
proceed with drafting of a CDM-AR-PDD, submission of a new methodology if necessary, validation,<br />
and registration for issuance of credits (in case of A/R CDM project activities, tCERs and lCERs are<br />
issued).<br />
2.4.4 Overview of approval process of A/R CDM project activities and A/R<br />
CDM methodologies<br />
As described in Chapter 1 (Figure 1-5), the basic steps of approval process of A/R CDM project<br />
activities are the same as emission reduction CDM project activities. In this section, brief explanation<br />
of the approval process is given in a step-by-step manner.<br />
Step 1: Determine if your project qualifies as a small scale A/R CDM project activity<br />
Project participants should first consider if their project meets the eligibility criteria of small scale A/R<br />
CDM project activities as listed below.<br />