BD2 System — 160 ... 1250 A<br />
© <strong>Siemens</strong> AG <strong>2011</strong><br />
Fire barrier<br />
Installing trunking units with fire barrier<br />
Recommended minimum dimensions of ceiling or wall cut-out<br />
c<br />
28–82 mm<br />
System<br />
current strength up to<br />
a 1)<br />
mm<br />
b<br />
mm<br />
400 A 90 200<br />
1250 A 150 200<br />
1<br />
b<br />
a<br />
NSV0_01035<br />
Trunking units with<br />
Tap-off unit<br />
BD2-AK1...,<br />
BD2-AK02..., BD2-AK2...,<br />
BD2-AK03..., BD2-AK3...<br />
Tap-off unit<br />
BD2-AK04..., BD2-AK05..., BD2-AK06...<br />
BD2-BWV or BD2-BDV<br />
(with or without tap-off unit)<br />
BD2.-...-EE<br />
(with or without tap-off unit)<br />
c<br />
mm<br />
125<br />
200<br />
200<br />
200<br />
Positioning in the fire ceiling<br />
1) For Z units depending on the lengths X*, Y*.<br />
100<br />
b<br />
a<br />
NSV0_01036<br />
1<br />
NSV0_01037a<br />
1<br />
Positioning in the fire wall<br />
Mounting position<br />
5<br />
NSV0_01038<br />
250 mm<br />
1<br />
When installing trunking units with fire barrier, the following<br />
points must be observed:<br />
• Only one trunking element may be passed through per component<br />
opening<br />
• The distance from the component opening to be closed to<br />
other openings or fittings must be at least 20 cm. As an exception<br />
to this, the spacing between adjacent component openings<br />
for barriers can be reduced to up to 10 cm.<br />
• Horizontally mounted busbar lines must be supported by a fixing<br />
bracket fitted approx. 500 mm before and after the component<br />
they pass through.<br />
• The space $ surrounding the busbar trunking unit within the<br />
component it passes through must be packed with mineralbased<br />
mortar or fire barrier sealant.<br />
• The gaps between PROMATECT-H(L) panels, the busbar<br />
trunking unit and the component must be sealed with fire barrier<br />
sealant (included in scope of supply if panels are required).<br />
• The mortar or fire barrier sealant must conform to the applicable<br />
regulations for establishing fire resistance rating or the<br />
construction of the wall or ceiling<br />
(e.g. DIN 1045 and DIN 1053 Part 1).<br />
• The mortar or fire barrier sealant must be provided by the customer.<br />
It must be installed in compliance with the locally applicable<br />
standards and regulations.<br />
• The installation work must be carried out according to pertinent<br />
building regulations (included in the scope of supply).<br />
NSV0_01039<br />
5/100 <strong>Siemens</strong> <strong>LV</strong> <strong>70</strong> · 04/<strong>2011</strong>