BD2 System — 160 ... 1250 A<br />

© <strong>Siemens</strong> AG <strong>2011</strong><br />

Fire barrier<br />

Installing trunking units with fire barrier<br />

Recommended minimum dimensions of ceiling or wall cut-out<br />

c<br />

28–82 mm<br />

System<br />

current strength up to<br />

a 1)<br />

mm<br />

b<br />

mm<br />

400 A 90 200<br />

1250 A 150 200<br />

1<br />

b<br />

a<br />

NSV0_01035<br />

Trunking units with<br />

Tap-off unit<br />

BD2-AK1...,<br />

BD2-AK02..., BD2-AK2...,<br />

BD2-AK03..., BD2-AK3...<br />

Tap-off unit<br />

BD2-AK04..., BD2-AK05..., BD2-AK06...<br />

BD2-BWV or BD2-BDV<br />

(with or without tap-off unit)<br />

BD2.-...-EE<br />

(with or without tap-off unit)<br />

c<br />

mm<br />

125<br />

200<br />

200<br />

200<br />

Positioning in the fire ceiling<br />

1) For Z units depending on the lengths X*, Y*.<br />

100<br />

b<br />

a<br />

NSV0_01036<br />

1<br />

NSV0_01037a<br />

1<br />

Positioning in the fire wall<br />

Mounting position<br />

5<br />

NSV0_01038<br />

250 mm<br />

1<br />

When installing trunking units with fire barrier, the following<br />

points must be observed:<br />

• Only one trunking element may be passed through per component<br />

opening<br />

• The distance from the component opening to be closed to<br />

other openings or fittings must be at least 20 cm. As an exception<br />

to this, the spacing between adjacent component openings<br />

for barriers can be reduced to up to 10 cm.<br />

• Horizontally mounted busbar lines must be supported by a fixing<br />

bracket fitted approx. 500 mm before and after the component<br />

they pass through.<br />

• The space $ surrounding the busbar trunking unit within the<br />

component it passes through must be packed with mineralbased<br />

mortar or fire barrier sealant.<br />

• The gaps between PROMATECT-H(L) panels, the busbar<br />

trunking unit and the component must be sealed with fire barrier<br />

sealant (included in scope of supply if panels are required).<br />

• The mortar or fire barrier sealant must conform to the applicable<br />

regulations for establishing fire resistance rating or the<br />

construction of the wall or ceiling<br />

(e.g. DIN 1045 and DIN 1053 Part 1).<br />

• The mortar or fire barrier sealant must be provided by the customer.<br />

It must be installed in compliance with the locally applicable<br />

standards and regulations.<br />

• The installation work must be carried out according to pertinent<br />

building regulations (included in the scope of supply).<br />

NSV0_01039<br />

5/100 <strong>Siemens</strong> <strong>LV</strong> <strong>70</strong> · 04/<strong>2011</strong>