Busbar Trunking Systems, Overview<br />

Busbars instead of cables<br />

■ Overview<br />

Easier when it comes to planning<br />

Easy to plan, quick to install and flexible to use: Busbar trunking<br />

systems from <strong>Siemens</strong> bring energy economically into any building.<br />

The power distribution system can be precisely planned<br />

from the total load rating and the type and number of loads. Clarity<br />

is assured by the line-shaped network topology with regularly<br />

arranged load feeders. Using standardized sizes, all applications<br />

can be implemented quickly and in minimum space.<br />

Quicker when it comes to installing<br />

Benefits during installation: Two-man assembly of busbar trunking<br />

systems saves time and money compared to the costly cable<br />

installation method. Installation errors are practically ruled out by<br />

the safe and user-guided connection technology. No special<br />

tools are required. Another benefit for quick installation: <strong>Siemens</strong><br />

busbar trunking systems are easy and therefore quick to mount<br />

with large distances between fixing centers (up to 4 m for bars<br />

compared to every 1.5 m for cables).<br />

Busbar trunking systems from <strong>Siemens</strong> are a cost-effective alternative<br />

to cable installation.<br />

High short-circuit strength and minimum fire load<br />

mean greater safety<br />

A step-ahead in terms of safety – be it short-circuit resistance or<br />

fire load. The BD2A-250 bus trunking systems have a fire load of<br />

just 1.32 kWh/m, for example, while the figure for comparable<br />

cables (NYY 4 × 95/50 mm 2 ) is 5.19 kWh/m. Also, the bars are<br />

halogen-free. Busbar trunking systems from <strong>Siemens</strong> have a<br />

high short-circuit strength. And the near-load protection from<br />

short-circuiting also facilitates troubleshooting.<br />

2<br />

High fire load with cables<br />

With cable installation, new loads are connected by way of an additional<br />

sub-distribution board, which is costly and time-consuming<br />

Tap-off units near the loads make local arrangements more transparent<br />

<strong>Low</strong> fire load with busbar trunking system<br />

More flexible in case of expansions and modifications<br />

If the power distribution system has to be adapted to new requirements,<br />

the busbar will take you quicker to your goal.<br />

For example, new tap-off units can simply be mounted on the<br />

tap-off points. The system can be expanded and modified without<br />

difficulty. Tap-off units and system parts increase the flexibility.<br />

Cost-intensive downtimes are eliminated or minimized. The<br />

power distribution system enables faultless operation with high<br />

user-friendliness and safety.<br />

<strong>Siemens</strong> <strong>LV</strong> <strong>70</strong> · 04/<strong>2011</strong><br />

2/11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!