11.11.2014 Views

After-School Initiative's Toolkit for Evaluating

After-School Initiative's Toolkit for Evaluating

After-School Initiative's Toolkit for Evaluating

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Flowchart <strong>for</strong> Selecting Post-only or Pre-post Evaluation Design<br />

The flow chart below is designed to guide staff in determining whether a post-only or a pre-post method would work best <strong>for</strong> their afterschool<br />

program and participants. It provides one framework <strong>for</strong> determining evaluation design, however, programs may choose to adjust<br />

the order to fit their needs.<br />

Post-<br />

Only<br />

Design<br />

Developmental Stage of<br />

Program<br />

New<br />

Established<br />

Post-<br />

Only<br />

Design<br />

Youth Literacy Level<br />

< 5th Grade 5th Grade +<br />

Post-<br />

Only<br />

Design<br />

Program Resources<br />

Low<br />

Adequate<br />

Post-<br />

Only<br />

Design<br />

Ceiling Effect on Outcomes<br />

Assessed<br />

Likely<br />

No<br />

Post-<br />

Only<br />

Design<br />

Audience Requires<br />

Rigorous Assessment<br />

No Yes Pre-Post<br />

Design<br />

<strong>Toolkit</strong> <strong>for</strong> <strong>Evaluating</strong> Positive Youth Development 93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!