19.11.2014 Views

Girard Systems- Warranty and Freight Procedures

Girard Systems- Warranty and Freight Procedures

Girard Systems- Warranty and Freight Procedures

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

--------------- GIRARD<br />

SYSTEMs"<br />

12) Test for proper functioning ofthe new motor connections byoperating the awning switch or<br />

the wind sensor switch. The upward arrows retracts. The downward arrows extend.<br />

13) Blow or spin anemometer cups to check for retraction (Important! Awningmustretract- if<br />

not, check motor connections for proper polarity.)<br />

14) After a motor has been replaced, it is extremelyimportant that the motorlimit switches be<br />

adjusted such thatthe motor turns offat the exact point (onlyifACL current limiting device<br />

is not compatible) that the awning box closes. Likewise, the motor should turn offat the<br />

exact point the awning arms reach full extension <strong>and</strong>'click' into place. Please see section<br />

entitled Adjusting Motor Limits Switches.<br />

SECTION IV. CONVERSION TO MANUAL OVERRIDE<br />

Ifa non-manual override motor is being replaced with a manual override motor, follow all<br />

procedures as outlinedin:<br />

Section I, Accessing the Motor<br />

Section II, Removing the OldMotor<br />

Then - Before beginningSection III, Installing the NewMotor, please complete the following:<br />

1) Locate the fabric guide rail on the inside front ofthe awning casing, <strong>and</strong> slide out to the<br />

right, away form casing, 3 to 4 inches.<br />

2) Using a hacksaw, cut off2 inches ofthis fabric guide rail ifthe awning is surface mounted.<br />

Use tin snips to cut offthe 2 inches ofthe fabric guide rail ifthe awning is recessed.<br />

3) Slide the fabric guide rail back in completely.<br />

4) Proceedwith step #1, ofSection III, Installing the NewMotor.<br />

AndThen:<br />

After installing the new motor <strong>and</strong> completing steps #1 through #4, <strong>and</strong> as you are testing the motor<br />

<strong>and</strong>wiring installation in step #12, complete the following:<br />

1) Stop the awning lead rail just before the box closes.<br />

2) The awning lead rail must have a clearance notch thatwill clear the manual override<br />

mechanism, as the lead rail closes into the awning casing.<br />

3) Ifthis hole is not present, proceed in cutting a hole 1-3/4" wide x 2" deep into the lead rail.<br />

A plastic sleeve is available to cover the edges to this hole <strong>and</strong> can be ordered under PIN<br />

1500275-54<br />

4) Proceed with steps #12 <strong>and</strong> #13.<br />

IMPORTANT NOTE: CHECK FOR CORRECT FUNCIONS BY SPINNINGTHE<br />

ANEMOMETER- AWNING MUST RETRACT WHEN ANEMOMETER IS SPUN!<br />

<strong>Girard</strong> <strong>Systems</strong> © 2005 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!