12) Test for proper functioning ofthe new motor connections byoperating the awning switch or<br />
the wind sensor switch. The upward arrows retracts. The downward arrows extend.<br />
13) Blow or spin anemometer cups to check for retraction (Important! Awningmustretract- if<br />
not, check motor connections for proper polarity.)<br />
14) After a motor has been replaced, it is extremelyimportant that the motorlimit switches be<br />
adjusted such thatthe motor turns offat the exact point (onlyifACL current limiting device<br />
is not compatible) that the awning box closes. Likewise, the motor should turn offat the<br />
exact point the awning arms reach full extension <strong>and</strong>'click' into place. Please see section<br />
entitled Adjusting Motor Limits Switches.<br />
SECTION IV. CONVERSION TO MANUAL OVERRIDE<br />
Ifa non-manual override motor is being replaced with a manual override motor, follow all<br />
procedures as outlinedin:<br />
Section I, Accessing the Motor<br />
Section II, Removing the OldMotor<br />
Then - Before beginningSection III, Installing the NewMotor, please complete the following:<br />
1) Locate the fabric guide rail on the inside front ofthe awning casing, <strong>and</strong> slide out to the<br />
right, away form casing, 3 to 4 inches.<br />
2) Using a hacksaw, cut off2 inches ofthis fabric guide rail ifthe awning is surface mounted.<br />
Use tin snips to cut offthe 2 inches ofthe fabric guide rail ifthe awning is recessed.<br />
3) Slide the fabric guide rail back in completely.<br />
4) Proceedwith step #1, ofSection III, Installing the NewMotor.<br />
AndThen:<br />
After installing the new motor <strong>and</strong> completing steps #1 through #4, <strong>and</strong> as you are testing the motor<br />
<strong>and</strong>wiring installation in step #12, complete the following:<br />
1) Stop the awning lead rail just before the box closes.<br />
2) The awning lead rail must have a clearance notch thatwill clear the manual override<br />
mechanism, as the lead rail closes into the awning casing.<br />
3) Ifthis hole is not present, proceed in cutting a hole 1-3/4" wide x 2" deep into the lead rail.<br />
A plastic sleeve is available to cover the edges to this hole <strong>and</strong> can be ordered under PIN<br />
1500275-54<br />
4) Proceed with steps #12 <strong>and</strong> #13.<br />
IMPORTANT NOTE: CHECK FOR CORRECT FUNCIONS BY SPINNINGTHE<br />
ANEMOMETER- AWNING MUST RETRACT WHEN ANEMOMETER IS SPUN!<br />