T ECHNICAL S ERVICES<br />

Worm Farms and Compost Bins<br />

The development <strong>of</strong> a comprehensive Waste Management Strategy<br />

is currently on hold pending the outcome <strong>of</strong> the Mindarie Regional<br />

Council’s Resource Recovery Facility plans for the region. Once this<br />

has been determined the method <strong>of</strong> collection and disposal <strong>of</strong><br />

waste in the Town will be further progressed.<br />

However, other initiatives which will form part <strong>of</strong> the overall<br />

strategy including the promotion <strong>of</strong> home composting such as<br />

‘worm farms’ and the use <strong>of</strong> home composting bins are currently<br />

in place and the Council subsidises the cost <strong>of</strong> worm farms and<br />

compost bins to the Town’s residents.<br />

Home composting bins are currently available to the Town’s<br />

residents for $45 per bin.<br />

Worm farm workshops are planned in <strong>2005</strong>-2006.<br />

Mindarie Regional Council<br />

The Town <strong>of</strong> <strong>Vincent</strong> and six other metropolitan local governments<br />

comprise the Mindarie Regional Council (MRC). The MRC is<br />

committed to reducing the amount <strong>of</strong> waste to landfill and has<br />

resolved to build a Resource Recovery Facility (RRF) to reduce the<br />

size <strong>of</strong> any future landfill at the existing landfill site located at Tamala<br />

Park and to dramatically increase the volume <strong>of</strong> materials recycled.<br />

The MRC plans to introduce the above RRF in stages, commencing<br />

in 2007. The nature <strong>of</strong> the RRF has yet to be determined, however,<br />

investigations are currently in progress and, once the facility is<br />

established, a new recycling system may be introduced in the Town.<br />

Engineering Design Services<br />

Manager: Craig Wilson<br />

The Engineering Design Services team is responsible for the<br />

development and implementation <strong>of</strong> the Town’s infrastructure<br />

upgrade programmes including roads, footpaths, drainage, rights<br />

<strong>of</strong> way, underground power, street lighting, signage and street<br />

furniture. The section also provides design and survey services<br />

for the Town’s Engineering and Parks Services sections.<br />

CAPITAL WORKS DESIGNED AND IMPLEMENTED<br />

DURING <strong>2004</strong>-<strong>2005</strong><br />

Cycling and Universal Access Improvements<br />

In the financial year <strong>2004</strong>-<strong>2005</strong> the Town spent $22,000 on<br />

Local Bicycle Network and Universal Access improvement projects.<br />

A majority <strong>of</strong> the works consisted <strong>of</strong> the installation <strong>of</strong> new<br />

pedestrian ramps and tactile ground indicators in keeping with the<br />

Town’s Disability Access and Inclusion Plan, as well as new bicycle<br />

parking facilities at various locations throughout the Town.<br />

Road Rehabilitation (State/Local Government<br />

funded road works)<br />

Two major road upgrading projects were carried out which were<br />

jointly funded by Main Roads WA, the <strong>City</strong> <strong>of</strong> Stirling and the Town.<br />

The value <strong>of</strong> these projects was in the order <strong>of</strong> $420,000, with the<br />

works comprising new kerbing, drainage improvements, pr<strong>of</strong>iling <strong>of</strong><br />

the existing pavement surface and applying a new asphalt overlay:<br />

Among the projects were:<br />

In the <strong>2004</strong>-<strong>2005</strong> year alone, the Town’s residents sent<br />

approximately 13,040 tonnes <strong>of</strong> refuse to landfill and recycled<br />

2385 tonnes <strong>of</strong> material which would otherwise have also gone to<br />

landfill. The new MRC initiatives aim to reverse this trend in the<br />

long term.<br />

• Walcott Street, North Perth/Menora (Hill Street to<br />

Redfern Street)*<br />

• Green Street, Mount Hawthorn (Dunedin Street to<br />

Scarborough Beach Road).**<br />

* Co-funded by the <strong>City</strong> <strong>of</strong> Stirling as Walcott Street is a boundary road.<br />

** West-bound lanes and median strip only resurfaced as <strong>City</strong> <strong>of</strong> Stirling<br />

resurfaced the east-bound lanes in the late 1990s.<br />

TOWN OF VINCENT _ A NNUAL R EPORT <strong>2004</strong>-<strong>2005</strong><br />

35