Management Report of the Board of Directors - Financial Year 2008<br />

- The contract job involving the execution of large diameter<br />

piles for “Southern Line. Pinheiro-Grândola Link. By-pass<br />

between Pinheiro station and km 94. Sado river crossing.<br />

Bridge and access viaducts”, for “Rede Ferroviária Nacional -<br />

REFER, E.P.”;<br />

3<br />

- The contract job for the “Extension of solid bulk cargo<br />

terminal at Figueira da Foz Harbour”, for “IPTM – Instituto<br />

Portuário e dos Transportes Marítimos, I.P.” – foundation<br />

piling work using Symmetrix technology;<br />

- The execution of peripheral containment walls on buildings<br />

located at Avenida Porto de Pesca Lote D, in Peniche, in<br />

Páteo do Bonjardim and Loop, in Porto and on Buildings 14<br />

and 15 of Lagoas Park, in Oeiras.<br />

4<br />

- The works to place a Waterproofing core wall and inverted<br />

plum line in the Pretarouca Dam, for Águas de Trás-os-<br />

-Montes, S.A..<br />

- The works to stabilise the existing excavation slopes<br />

between km 26+575 and km 25+900, in the Loures/Bucelas<br />

sub-link (direction Alverca/Estádio Nacional) of A9, for “BRISA<br />

– Auto-estradas de Portugal, S.A.”,<br />

Among the works in progress, the most significant are:<br />

5<br />

- The contract job for general excavation and peripheral<br />

containment walls of the Business and Technology Complex of<br />

Porto, for “IMOFARMA – Empreendimentos Imobiliários, Lda.”;<br />

2 REFER / Sado River Railway Crossing – Bridge and Approach Viaducts - Execution of Large Diameter<br />

Piles / Alcácer do Sal<br />

3 Millennium BCP / Peripheral Containment Walls in Páteo do Bonjardim and Loop / Porto<br />

4 Brisa / Stabilization of the Existing Excavation Slopes between km 26+575 and km 25+900,<br />

in Sublink Loures/Bucelas (Alverca/Estádio Nacional direction) of A9<br />

5 Imofarma / General Excavation and Peripheral Containments of the Entrepreneurial and Technological<br />

Complex / Porto<br />