01.02.2015 Views

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Management Report of the Board of Directors - Financial Year 2008<br />

- Construction works of the Ribeira de São Jorge/Arco de S.<br />

Jorge Expressway – 1 st Phase – Tunnels, in Madeira Island,<br />

for “RAMEDM – Estradas da Madeira, S.A.”, which includes<br />

the construction of three 1500 metre long tunnels. The<br />

relevant excavation works have been completed and the work<br />

is expected to be handed over in June 2009.<br />

33<br />

- Execution of the ETAR (Wastewater Treatment Plant) of<br />

Serzedelo II, for “Águas do Ave, S.A.”;<br />

- Execution of the Pretarouca Dam, in Lamego, for “Águas de<br />

Trás-os-Montes e Alto Douro, S.A.”;<br />

The following works are still in the start-up stage:<br />

34<br />

- Construction of the Tide Intercepting System and Valve<br />

Chambers, at Terreiro do Paço, in Lisbon, for “SIMTEJO,<br />

S.A.”;<br />

- Reboleira Station, for “Metropolitano de Lisboa, E.P.”;<br />

- Construction of links on IC 24 and on IC 29, and construction<br />

of the Bridge over the Douro River, comprised in the<br />

Construction works of the Douro Litoral Concession, for<br />

“DLACE – Douro Litoral, ACE”.<br />

35<br />

32 RAMEDM / Express Highway of Ribeira de São Jorge/Arco de S.Jorge – 1 st Phase - Tunnels /<br />

Madeira<br />

33 Águas do Ave, S.A. / Residual Waters Treatment Plant (RWTP) of Serzedelo II<br />

34 Águas de Trás-os-Montes e Alto Douro / Pretarouca Dam / Lamego<br />

35 SIMTEJO / Intercepting System and Tide Valves Chamber, in Terreiro do Paço / Lisbon<br />

51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!