01.02.2015 Views

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

A N N U A L R E P O R T A N D A C C O U N T S - CMVM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Management Report of the Board of Directors - Financial Year 2008<br />

financial crisis may negatively affect the company’s<br />

results.<br />

AEDL - Auto-Estradas do Douro Litoral, S.A. is a company<br />

in which “TEIXEIRA DUARTE - Engenharia e Construções,<br />

S.A.” holds 18% of its capital stock and which signed the<br />

Douro Litoral concession contract with the Portuguese State<br />

at the end of December 2007.<br />

Said concession contract will last 27 years and envisages<br />

the design, project, construction, increase of the number of<br />

lanes, financing, preservation and running of the highway<br />

links and associated road links, called “Concessão Douro<br />

Litoral” (Douro Litoral Concession), along a total of 129Km,<br />

of which 78Km include toll-gates.<br />

LUSOPONTE - Concessionária para a Travessia do Tejo,<br />

S.A. is a company exclusively dedicated to the management,<br />

under a concession scheme, of the two Road crossings over<br />

Tagus River, in the region of Lisbon, and in which “TEIXEIRA<br />

DUARTE - Engenharia e Construções, S.A.” holds a 7.5% of<br />

the capital stock.<br />

The Company’s performance was relatively stagnant during<br />

the year under review, having recorded a 0.6% decrease in<br />

profit before tax, achieving EUR 16,987 thousand compared<br />

to EUR 17,093 thousand in 2007.<br />

Basically due to the economic crisis in Portugal, for the third<br />

consecutive year there was an overall reduction of the traffic<br />

in the two bridges under concession, representing a 1.2%<br />

decrease compared to the previous year.<br />

Even so, a strong cost control policy at all levels allowed a<br />

minimum deviance in relation to the budget and a net profit<br />

after tax of EUR 12,441 thousand, 1% below the one<br />

reported for 2007.<br />

TDHOSP - Gestão de Edifício Hospitalar, S.A.,<br />

incorporated on 24 th January 2008, is 100% owned by<br />

“TEIXEIRA DUARTE - Engenharia e Construções, S.A.” and<br />

is dedicated to the management of the new Cascais Hospital<br />

for a period of 30 years, envisaging the design, project,<br />

construction, financing, preservation and maintenance<br />

activities.<br />

The management contract was signed on 22 nd February 2008<br />

with the Regional Health Administration and with “HPP –<br />

Parcerias Cascais, S.A.”. The Hospital construction<br />

commenced on the same date and is expected to be<br />

completed in a period of 24 months.<br />

The construction is under the responsibility of “Teixeira Duarte<br />

- Engenharia e Construções, S.A.”, while the maintenance of<br />

the future building shall be performed by “TDGI – Tecnologia<br />

e Gestão de Imóveis, S.A.”.<br />

In July 2008, the Court of Auditors issued a document in<br />

which it informed that it had refused to approve the<br />

contract. This temporary decision slowed down the pace of<br />

the works in the months of August, September and October,<br />

in order to promote an approximation of the construction<br />

volume to that established in the Work Schedule under the<br />

contract.<br />

On 8 th October 2008, an amendment to the management<br />

contract was signed, which made up for the underlying<br />

reserves that had led to the refusal of its approval, allowing<br />

its concession on 4 th November of the same year.<br />

TDHOSP, S.A. has developed its activity for the purpose of<br />

guaranteeing that the works are carried out according to<br />

schedule, coordinating the various parties involved so as to<br />

create the conditions for an excellent performance within the<br />

future building management phase.<br />

Despite the difficulties generated by the lack of definition as<br />

to the characteristics of the clinical equipment required for<br />

the preparation and execution of the contract job works, it<br />

has progressed at good pace and the works completion rate<br />

is 20.0%, while in accordance with the contract schedule it<br />

should be 18.2%.<br />

TDHOSP, S.A. started the ISO 9001 quality certification<br />

process, although the certification of the Company’s<br />

overall activity will only be possible after the<br />

84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!