Management Report of the Board of Directors - Financial Year 2008<br />

Catenary erection works:<br />

- Fusion des Postes de la zone élargie d`Aulnoye;<br />

- GOP V2 2008 and Création ITCS Hazebrouk/Dunquerke;<br />

- Construction of a new railway track projected between<br />

Taourirt and Nador, including the project and installation of the<br />

layout on a concreted railway track at Beni Ansar Harbour<br />

(130Km);<br />

- LGV RHIN RHONE – Remaniement Préparatif au<br />

Raccordement de Petit Croix;<br />

- Création du raccordement de Blangy : Ligne de Paris – Lille.<br />

- LIBYA<br />

Following the work that “Teixeira Duarte – Engenharia e<br />

Construções, S.A.” and other companies comprised in its<br />

economic group have been carrying out in North Africa with<br />

greater dimension and regularity, it was deduced that the<br />

Libyan market appears to have great capacity and growth<br />

potential, so Company decided to start operating in that<br />

Country, mainly including the incorporation of a local<br />

connection office, for the purpose of allowing it to perform its<br />

activity under the legally admitted terms and requirements<br />

and in a nimble, organised manner, suited to the local<br />

conditions.<br />

In 2008, the Company continued to approach local agents<br />

with the signing of several joint performance protocols, which<br />

makes it possible to envisage 2009 as the year of its<br />

production start-up in that Country.<br />

- MOROCCO<br />

This market has been gaining increasing importance in the<br />

operation of the investee company SOMAFEL, S.A., which<br />

developed the logistics and industrial production in three<br />

large construction yards.<br />

During 2008, the following works for “ONCF – Office National<br />

de Chemins de Fer” deserve highlighting:<br />

- Full renewal of the railway track between Tangiers and<br />

Mechraa Bel Ksiri (70 Km);<br />

74 ONCF / New Railway Track in the Link Projected between Taourirt and Nador<br />

- Project and installation of a concreted railway track at<br />

Tangiers-Mediterranée Harbour.<br />

SOMAFEL, S.A. continues with expectations of reinforcing its<br />

activity in this Country, through catenary works and with<br />

preservation and maintenance contracts.<br />

- MOZAMBIQUE<br />

The construction market revealed an unusual higher activity,<br />

both at tender level, and in the awarding of Works, especially<br />

during the second semester of 2008, which provided a much<br />

larger works portfolio and with high expectations for 2009.<br />

During the year under review, the completion of the following<br />

contract jobs deserves highlighting:<br />

- Construction of the reinforced concrete structure for a trade<br />

and services building, in Maputo, for “MMD – Construções,<br />

Limitada”;<br />

- Mitigation of erosion at Tofo beach, in the Province of<br />

Inhambane, for “Telecomunicações de Moçambique<br />

S.A.R.L.”.<br />