Management Report of the Board of Directors - Financial Year 2008<br />

- MECHANICAL ENGINEERING OPERATION CENTRE<br />

40<br />

41/42<br />

In its speciality, the Mechanical Engineering Centre regularly collaborates with other<br />

Operation Centres in the Company and also with other companies integrated in the<br />

Teixeira Duarte Group.<br />

Within the scope of these works, we would like to highlight the construction and<br />

erection of the metal decks of the Railway Bridge and Viaducts for the New Crossing<br />

over Sado River, which is currently underway.<br />

For external clients, we would like to highlight, in the Hydro-Mechanical Equipment<br />

area, the Improvement of the Returning Flood Gates of the Crestuma Power Plant,<br />

for “EDP – Gestão de Produção de Energia, S.A.”.<br />

40 REFER / Assembly of the Bridge Metal Decks and Railway Viaducts for the New Crossing over the Sado River<br />

41 EDP / Improvement of the Returning Floodgates of the Crestuma Power Plant<br />

42 ANA - Agence National des Autoroutes / 2ème Rocade Autoroutiere D’Alger Sur<br />