Management Report of the Board of Directors - Financial Year 2008<br />

In 2008, this Company reported, in individual terms, a 33.5%<br />

increase in operating profit, which was fully due to the internal<br />

market and reached EUR 61,159 thousand.<br />

The development of mining infrastructures contributed to the<br />

most important portion for the production volume achieved,<br />

followed, in order of importance, by the construction of road<br />

tunnels.<br />

In the contract job for the Construction of the Ribeira de S.<br />

Jorge – Arco de S. Jorge Expressway – 1 st Phase – Tunnels,<br />

in progress for “RAMEDM – Estradas da Madeira, S.A.”,<br />

executed under a consortium arrangement, 3.890 metres of<br />

tunnels and connection galleries were excavated, leaving the<br />

opening of the road lanes practically completed and preparing<br />

the ground to receive the final layer of the reinforced concrete.<br />

In the Moinho and Feitais mines, in Aljustrel, more than<br />

8.2 km of tunnels were built, despite the fact that<br />

“Pirites Alentejanas, S.A.” decided, on 31 st October, to<br />

suspend all the production activity, and consequently<br />

terminated all the work contracts it had with several service<br />

providers.<br />

49 RAMEDM / Express Highway of S. Jorge - Arco de S. Jorge – 1 st . Phase - Tunnels<br />

Lastly, mention must also be made of the fact that EPOS, S.A.<br />

also worked within the “PERFORESC – Perfurações e<br />

Escavações, A.C.E.” group, in which it holds a 60% stake,<br />

while the remaining 40% is held by “Teixeira Duarte –<br />

Engenharia a Construções, S.A.”.<br />

48 SOMINCOR / Execution of the Tunnels at Neves Corvo Mines<br />

In those same mines, and only during the first ten months of<br />

the year, 107,000 m 3 of ore were excavated and removed<br />

underground and important complementary works were<br />

carried out, among which we highlight the opening of 283<br />

metres of mining pits and the installation of 11.500 linear<br />

metres of steel cable anchorage slings.<br />

In the Neves Corvo mine, the works that were being carried<br />

out for “SOMINCOR – Sociedade Mineira de Neves Corvo,<br />

S.A.”, continued, having completed 8.7 km of tunnels and<br />

applied approximately 29,000 m 3 of sprayed concrete.<br />

In 2008, EPOS, S.A. continued its effort to expand and<br />

modernise its machinery fleet, investing EUR 8,332<br />

thousand, essentially for the purchase of basic production<br />

equipment.<br />

An orders portfolio amounting to EUR 30 million was carried<br />

forward to 2009. Considering that some of projects for which<br />

bids were previously submitted will be awarded, the operating<br />

profit is expected to reach EUR 50 million.<br />

Within the scope of the Integrated Safety, Quality and<br />

Environmental Management System the usual follow-up<br />

audits were performed, this time simultaneously analysing the<br />

change/migration to OHSAS 18001:2007, and the certifying<br />

entity recommended recertification in accordance with the<br />