02.03.2015 Views

JP 3-33, Joint Task Force Headquarters - Defense Innovation ...

JP 3-33, Joint Task Force Headquarters - Defense Innovation ...

JP 3-33, Joint Task Force Headquarters - Defense Innovation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix D<br />

(2) The JIMB:<br />

(a) Identifies and validates information exchange requirements.<br />

(b) Creates and maintains the IMP.<br />

(c) Acts as a focal point for coordinating JTF IM policy.<br />

directorate).<br />

(d) Operates under the supervision of the chief of staff (or designated staff<br />

(e) Resolves cross-functional and contentious IM issues.<br />

(f) Coordinates additional training required by staff and component elements<br />

to support production of quality information through effective IM procedures.<br />

e. <strong>Joint</strong> <strong>Task</strong> <strong>Force</strong> Staff Directors<br />

(1) Implement internal staff directorate procedures to comply with the IMP.<br />

(2) Identify critical and relevant information to be placed on the HQ battle rhythm<br />

matrix. The JOC staff informs the IMO of any changes to information needs prompted by<br />

the HQ battle rhythm.<br />

(3) Appoint a staff directorate IM representative and RFI manager as points of<br />

contact for IM matters and RFIs. This can be the same individual, though it is not<br />

recommended to dual-hat in the JTF J-2 and J-3 directorates.<br />

(4) Ensure training is completed for basic IM, RFI management, and security<br />

procedures for all personnel in the staff directorates.<br />

(5) Assess IM to assure the flow of quality critical and relevant information.<br />

(6) Note: The JNCC, as an element of the JTF J-6, exercises control over the<br />

communications system and serves as the single control agency for the management and<br />

operational direction of the joint communications network. The JNCC performs<br />

planning, execution, technical direction, and management over the communications system.<br />

See Chapter X, “<strong>Joint</strong> <strong>Task</strong> <strong>Force</strong> Communications,” for further discussion of JTF J-6 IM<br />

responsibilities as they relate to IM systems management.<br />

f. <strong>Joint</strong> Data Network Operations Cell<br />

(1) The JDNC is a task-organized team of experienced personnel that supports the<br />

JDN operations officer. The JDNC shall be staffed, trained, and equipped to support<br />

continuous operations and should consist of personnel knowledgeable in the operations of<br />

participating components to optimize multi-Service experience and overcome C2 system<br />

interoperability challenges. The JDNC’s mission is to plan the C2 architecture, maintain<br />

configuration control, manage and integrate selected data provided by the various networks,<br />

D-6 <strong>JP</strong> 3-<strong>33</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!