19.04.2015 Views

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPERATING THE MACHINE<br />

OPERATING BACKHOE<br />

1. Place the bucket teeth on the ground with the bottom of<br />

the bucket at a 45 degree angle to the ground.<br />

2. Pull the bucket toward the machine using the arm as the<br />

main digging force.<br />

3. When soil sticks to the bucket, remove it by moving the<br />

arm and/or bucket rapidly back and forth.<br />

4. When trenching a straight line, position the tracks parallel<br />

to the trench. After digging to the desired depth,<br />

move the machine as required to continue the trench.<br />

M107-05-037<br />

IMPORTANT: When lowering the boom, avoid sudden<br />

stops that may cause shock load damage to<br />

the machine.<br />

When operating the arm, avoid bottoming<br />

the cylinder to prevent cylinder damage.<br />

When digging at an angle, avoid striking the<br />

tracks with the bucket teeth.<br />

When digging a deep excavation, avoid<br />

striking the boom or bucket cylinder hoses<br />

against the ground.<br />

GRADING OPERATION<br />

IMPORTANT: Do not pull or push dirt with the bucket<br />

when traveling.<br />

Select grading mode when finishing work is required.<br />

Position the arm slightly forward of the vertical position with<br />

bucket rolled back, as shown.<br />

Operate arm roll-in function while slowly raising the boom.<br />

Once the arm moves past, the vertical position slowly lower<br />

the boom to allow the bucket to maintain a smooth surface.<br />

M104-05-017<br />

Grading operation can be more precisely done by operating<br />

the boom, arm and bucket simultaneously.<br />

5-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!