19.04.2015 Views

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAINTENANCE<br />

17 Check Tightening Torque of Bolts and Nuts<br />

--- every 250 hours (first time after 50 hours)<br />

Check tightness after the first 50 hours then every 250<br />

hours. Tighten to torque shown if any are loose. Bolts and<br />

nuts should be replaced with those of the same or higher<br />

grade.<br />

For tightening nuts and bolts other than specified in<br />

the table below, refer to the Tightening Torque Chart<br />

at the end of this section.<br />

IMPORTANT: Check and tighten bolts and nuts using<br />

a torque wrench.<br />

ZX180-3 Class<br />

Wrench<br />

Bolt Dia<br />

No.<br />

Descriptions<br />

Q’ty Size<br />

Torque<br />

mm mm N•m (kgf•m)<br />

1<br />

Engine cushion rubber mounting bolt and nut (Pump side) 18 4 27 400 (40)<br />

Engine cushion rubber mounting bolt and nut (Fan side) 16 4 24 240 (24)<br />

2 Engine bracket mounting bolt (Pump side) 12 8 19 110 (11)<br />

3 Hydraulic oil tank mounting bolt 16 4 27 550 (55)<br />

4 Fuel tank mounting bolt 18 4 24 270 (27)<br />

5<br />

Radiator mounting bolt (Upper side) 16 2 24 270 (27)<br />

Radiator mounting bolt (Lower side) 16 3 24 270 (27)<br />

6 Pump transmission mounting bolt 10 8 17 65 (6.5)<br />

7<br />

Control valve mounting bolt 16 4 24 210 (21)<br />

Control valve bracket mounting bolt 16 4 24 270 (27)<br />

8 Swing device mounting bolt 20 12 30 500 (50)<br />

9 Swing motor mounting bolt 12 8 10 90 (9)<br />

17 25 (2.5)<br />

19 30 (3)<br />

22 40 (4)<br />

10 ORS fittings for hydraulic hoses and piping<br />

27 95 (9.5)<br />

32 140 (14)<br />

36 180 (18)<br />

41 210 (21)<br />

11 Hycolin tube mounting nut – – 17 35 (3.5)<br />

12 Battery mounting nut 10 4 17 50 (5)<br />

Cab mounting nut 16 4 24 210 (21)<br />

13 Cab mounting anchor bolt 22 2 32 550 (55)<br />

Cab cushion rubber mounting bolt 12 8 19 110 (11)<br />

6 – 10 10 (1)<br />

14 Cover mounting bolt<br />

10 – 17 50 (5)<br />

12 – 19 90 (9)<br />

Flexible master coupling of piping 1/4-28UNF 11 6 (0.6)<br />

9 7 6 (0.6)<br />

15 Jubilee clamp of high pressure piping<br />

11 7 6 (0.6)<br />

4 8 6 (0.6)<br />

T-bolt clamp of high pressure piping 9 10 6 (0.6)<br />

16 Swing bearing mounting bolt to<br />

(Upperstructure) 20 37 30 510 (51)<br />

(Undercarriage) 20 36 30 490 (49)<br />

Travel device mounting bolt 20 28 30 630 (63)<br />

17 Travel reduction device cover mounting bolt 14 12 22 180 (18)<br />

Sprocket mounting bolt 20 32 30 480 (48)<br />

18 Upper roller mounting bolt 16 16 24 270 (27)<br />

19 Lower roller mounting bolt 18 72 27 460 (46)<br />

20 Track shoe mounting bolt<br />

ZX160-3 20 344 27 820 (82)<br />

ZX180LC-3, 180LCN-3 20 392 27 820 (82)<br />

21 Track guard mounting bolt 18 16 27 500 (50)<br />

7-85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!