19.04.2015 Views

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

Untitled - Flannery Plant Hire

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMERGENCY BOOM LOWERING PROCEDURE<br />

(Without hose-rupture safety valve)<br />

OPERATING THE MACHINE<br />

WARNING: Prevent personal injury. Confirm that no<br />

one is under the front attachment before starting the<br />

procedure below.<br />

ZX120-3 class<br />

If the engine abnormally stalls and cannot be restarted,<br />

lower the boom to the ground by following the emergency<br />

procedures described below.<br />

1<br />

Base Machine Rear Side<br />

Boom 1<br />

1. Remove rubber caps (1) and (2) from the boom 1 section<br />

on the 4 spool control valve.<br />

2. Turn lock nut (8) (with hexagonal width across flats: 17<br />

mm) counterclockwise to remove with an offset box<br />

wrench or a spanner.<br />

3. Turn screw (7) (with hexagonal hole width across flats: 4<br />

mm) clockwise with a hexagon wrench until it comes to<br />

stop.<br />

4. Turn lock nut (5) (with hexagonal width across flats: 17<br />

mm) counterclockwise to slightly loosen with an offset<br />

wrench or a spanner.<br />

5. While turning screw (6) (with hexagonal hole width<br />

across flats: 4 mm) clockwise with a hexagon wrench to<br />

adjust the boom lowering speed, lower the boom. Do not<br />

remove snap ring (3) and washer (4) at this time. In addition,<br />

do not turn screw (6) to such extend as washer (4) is<br />

deformed.<br />

IMPORTANT: Unless lock nuts (5) and (8) are sufficiently<br />

tightened, oil leakage may increase. Be sure<br />

to completely tighten the lock nuts (5) and<br />

(8) to the torque specified below.<br />

6. After the boom is lowered to the ground, allow screws<br />

(6) and (7) to be fully loosened by turning them counterclockwise.<br />

Then, turn screw (7) one eighth of a turn<br />

clockwise and tighten lock nuts (5) and (8).<br />

Tightening torque: 20 N•m (2 kgf•m)<br />

2<br />

7<br />

2<br />

8<br />

Control Valve<br />

M175-05-001<br />

6<br />

3<br />

4<br />

1<br />

5<br />

7. Take care to correctly install rubber caps (1) and (2) in<br />

their respective original position.<br />

NOTE: Conduct the work of screw (7) and screw (6) in order.<br />

M154-05-001<br />

5-33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!