TRINCOMALEE BAY SPECIAL MANAGEMENT AREA Page | 59<br />
Table V.4: Comparison of planning process with CCD SAM planning process<br />
No CCD requirement SAM Plan <strong>com</strong>pliance<br />
i. Site identification and<br />
agreement on SAM site<br />
ii.<br />
Preparing site plan<br />
a. Identification of issues<br />
through <strong>com</strong>munity<br />
participation(use<br />
appropriate tools such<br />
as PRA, SWOT, LFA)<br />
b. Establishment of<br />
Community Coordinating<br />
Committee (CCC) which<br />
consist of Resource<br />
users, Resource<br />
Guardians and Resource<br />
Managers<br />
c. Prioritization of identified<br />
issues and preparation<br />
of environmental profile<br />
using secondary and<br />
primary data<br />
d. Preparation of draft SAM<br />
Plan should prepare plan<br />
through transparent and<br />
flexible process with the<br />
participation of<br />
stakeholders<br />
- CZMP 1997 identified Trin<strong>com</strong>alee Bay as potential SAM<br />
site;<br />
- Trin<strong>com</strong>alee bay, Nilaveli beach, Pigeon island, Periya<br />
Karachchi and Sinna Karachchi estuaries and Clappenburg<br />
bay have been identified as Level-1 sites in CCD special<br />
gazette notification on CZMP in 2006.<br />
- Applied <strong>com</strong>munity consultation and used Participatory<br />
Rural Appraisal) PRA tools such as Focus Group Discussion<br />
(FGD), transect walk, small group discussion;<br />
- Strengths, Weaknesses, Opportunities, Threats (SWOT)<br />
analysis;<br />
- Log frame Analysis (LFA).<br />
- Divisional Coordinating Committee formed by NECCDEP<br />
used for <strong>com</strong>munity consultation process;<br />
- Trin<strong>com</strong>alee District SAM CCC (DSAM CCC) formed by<br />
NECCDEP used as higher level consultation process;<br />
- Resource users and Resource Guardians representation at<br />
DSAM-CCC enhance by appointing more <strong>com</strong>munity and<br />
CBO / NGO members from SAM area to DSAM-CCC;<br />
- DSAM-CCC <strong>com</strong>prises Resource users, Resource<br />
Guardians and Resource Managers.<br />
- Reviewed and adopted the NECCDEP interim plan which<br />
identified and prioritized the issues in an appropriate<br />
manner;<br />
- Environmental profile was developed through a review of<br />
secondary data from study reports and primary data from<br />
NECCDEP special studies and IP-NGO DSD level coastal<br />
resource profiles.<br />
- Planning process involved relevant stakeholders ;<br />
- Consultation processes involved relevant stakeholders<br />
- Draft plan presented to DSAM-CCC for <strong>com</strong>ments and<br />
suggestions;<br />
- Final draft to be approved by CCD.<br />
iii Declaration of SAM site NECCDEP will submit finalised TB SAM Plan to CCD to<br />
declare TB SAM as a SAM site.<br />
iv.<br />
Implementation of selected<br />
activities simultaneously<br />
with SAM planning process<br />
v. Monitoring and evaluation<br />
of SAM plan<br />
implementation (Should be<br />
carried out using identified<br />
indicators in the planning<br />
process)<br />
NECCDEP implemented the interim plan during the period<br />
2006-2009. Implementation of this <strong>com</strong>prehensive SAM Plan<br />
is contingent on approval and resourcing.<br />
- Appropriate implementation, monitoring and evaluation and<br />
institutional mechanisms are included in the plan;<br />
- Specific, measurable, achievable, realistic and time bound<br />
(SMART) indicators are included in the logical framework.<br />
- SAM offices will do the monitoring at the village level whilst<br />
the DSAM-CCC will do the overall monitoring and evaluation<br />
of the implementation process.