- Page 1 and 2:
\ LEGAL SERVICES VIA FEDEX NEXT DAY
- Page 3 and 4:
Vendor Name Eaton Corp. ; Date Ttu-
- Page 5 and 6:
Act 129 Contract Vendor: Vendor Add
- Page 7 and 8:
Change to Contract Page 2 of 3 ISSU
- Page 9 and 10:
ALLEGHENV ENERGY SERVICE CORPORATIO
- Page 11 and 12:
12. Each party.ag/ees that tha Conf
- Page 13 and 14:
IMPORTANT If the certificate holder
- Page 15 and 16:
MMC 4/9/2010 1:57:31 PM PAGE 2/003
- Page 17 and 18:
This Guide addresses those aspects
- Page 19 and 20:
Purpose The purpose of the Eaton Co
- Page 21 and 22:
When alcohol or drug abuse is suspe
- Page 23 and 24:
Drug Testing Procedures Testing for
- Page 25 and 26:
Reports for Results of Drug Testing
- Page 27 and 28:
employee should be informed that lo
- Page 29 and 30:
• Can drug test job applicants pr
- Page 31 and 32:
Questions and Answers 1. What if th
- Page 33 and 34:
GLOSSARY OF TERMS Aliquot: A small
- Page 35 and 36:
RECEIVED Appendix A - Corporate Pol
- Page 37 and 38:
tamper-evident label/seals (CCF, St
- Page 39 and 40:
13.The BAT will transmit the test r
- Page 41 and 42:
Appendix E - Sample Letter [Employe
- Page 43 and 44:
Appendix # 8 K PUBLIC AUG 27 SAFETY
- Page 45 and 46:
WLTW 1. SUMMARY OF APPROACH Summari
- Page 47 and 48:
Vendor Name Eaton Corp. Date ITUi+Y
- Page 49 and 50:
TABLE OF CONTENTS 1. Introduction 3
- Page 51 and 52:
1. Introduction West Penn Power Com
- Page 53 and 54:
2009. Late submittals will be rejec
- Page 55 and 56:
8. Additional Information Allegheny
- Page 57 and 58:
17. Scope Of Work A. Description Al
- Page 59 and 60:
D. Submittal of Invoice Requirement
- Page 61 and 62:
party, nor its representatives, wil
- Page 63 and 64:
GENERAL TERMS AND CONDITIONS 1. BUY
- Page 65 and 66:
Appendix 3 BACKGROUND INVESTIGATION
- Page 67 and 68:
Appendix # 4 A. Introduction This s
- Page 69 and 70:
Appendix # 5 Evaluation and Selecti
- Page 71 and 72:
Appendix # 7 Pursuant to Public Law
- Page 73 and 74: 8. By signing the Plan, the contrac
- Page 75 and 76: 9. The contractor shall presume tha
- Page 77 and 78: ALLEGHENY ENERGY SERVICE CORPORATIO
- Page 79 and 80: ALLEGHENY ENERGY SERVICE CORPORATIO
- Page 81 and 82: Appendix # 9 1.0 PURPOSE Allegheny
- Page 83 and 84: 4.0 TESTING PROCEDURE a. The follow
- Page 85 and 86: e. Previous Positive Test Results:
- Page 87 and 88: Coltection & Examination Sites DOT
- Page 89 and 90: Collection & Examination Sites DOT
- Page 91 and 92: Collection & Examination Sites DOT
- Page 93 and 94: Collection & Examination Sites DOT
- Page 95 and 96: Appendix # 10 GUIDELINES FOR BIDDIN
- Page 97 and 98: ScopaMAudn: rsedrilpHIIIan. Commtrt
- Page 99 and 100: Appendix # 12 PENNSYLVANIA PUBLIC U
- Page 101 and 102: Commission should establish for con
- Page 103 and 104: may be appealed to the Commission c
- Page 105 and 106: 7. Names of parent and subsidiary c
- Page 107 and 108: the registry those entities that wi
- Page 109 and 110: not to include entities that only s
- Page 111 and 112: the Commission to reduce the filing
- Page 113 and 114: %CA A^mx A 65
- Page 115 and 116: Application Form for Parties Wishin
- Page 117 and 118: BEFORE THE PENNSYLVANIA PUBLIC UTIL
- Page 119 and 120: Give name and address of the affili
- Page 121 and 122: Organizational structure including
- Page 123: Sworn and subscribed before me this