West Penn Power Contract with Eaton Corporation as a CSP
West Penn Power Contract with Eaton Corporation as a CSP
West Penn Power Contract with Eaton Corporation as a CSP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D. Submittal of Invoice Requirements<br />
Upon completion ofthe initial site visit, preparation ofthe energy audit, and<br />
submittal ofthe engineering reports, the vendor shall submit an invoice listing all<br />
man-hours, travel expenses, and costs incurred. If a project requires extensive site<br />
investigation time and/or reporting, progressive billing can be submitted.<br />
Any additional time required for additional meetings and/or requested analysis<br />
beyond the original scope ofthe project will be provided on a time and material<br />
b<strong>as</strong>is.<br />
18. Monitoring Provisions and Procedures<br />
The vendor shall be able to provide M&V services for pre and post commissioning of<br />
retrofit applications. A guide for performing these me<strong>as</strong>urements will be developed at a<br />
later date. We anticipate that me<strong>as</strong>urements will be required at the retrofit and system<br />
level and that shoit and continuous monitoring activity will be required. In applications<br />
where energy use and savings can be estimated b<strong>as</strong>ed on engineering calculations or<br />
computer modeling, the vendor will review the methodology <strong>with</strong> the AP.<br />
19. Execution of Agreement<br />
Upon execution of the Purch<strong>as</strong>e Order issued by Allegheny <strong>Power</strong> Service <strong>Corporation</strong>,<br />
agent for Allegheny <strong>Power</strong>, the terms and conditions ofthe Request for Proposal, General<br />
Terms and Conditions, and Non Disclosure Agreement, shall constitute the Agreement,<br />
<strong>with</strong> intent to be legally bound, between bidder and Allegheny <strong>Power</strong>.<br />
Bidders are required lo execute the Confidentiality Agreement (Appendix 1) and the<br />
Background Investigations (Appendix 3) post bid and pre contract award.<br />
In accordance <strong>with</strong> the PAPUC's Implementation Order entered February 5, 2009, a<br />
criminal and other background check is required for persons <strong>as</strong>sociated <strong>with</strong> the bidder<br />
who will enter the premises of Allegheny <strong>Power</strong> customers or have personal contact <strong>with</strong><br />
said customers. The scope ofthe criminal and background check is provided in<br />
Appendix No. 3. <strong>Contract</strong> award is subject to these requirements being fulfilled to<br />
Allegheny <strong>Power</strong>'s satisfaction.<br />
11