30.06.2015 Views

West Penn Power Contract with Eaton Corporation as a CSP

West Penn Power Contract with Eaton Corporation as a CSP

West Penn Power Contract with Eaton Corporation as a CSP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This Guide addresses those <strong>as</strong>pects of the <strong>Eaton</strong> Substance Abuse Program that<br />

are not regulated by the Department of Transportation (DOT) such <strong>as</strong> the Federal<br />

Aviation Administration or the Federal Motor Carrier Safety Administration. This is<br />

often referred to <strong>as</strong> non-mandated testing or Non-DOT testing. The additional<br />

requirements applicable to certain locations covered by the DOT regulations are<br />

accomplished through a separate program <strong>with</strong>in <strong>Eaton</strong> Aerospace and its FAA<br />

defined Repair Station facilities.<br />

-2-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!