Table 4.7 Total generat<strong>in</strong>g capacity of power plants ga<strong>in</strong><strong>in</strong>g fund<strong>in</strong>g from RWMHEEF under<br />

ER 1-94, as of 24 July 2002<br />

Power plant Generat<strong>in</strong>g capacity (MW)<br />

Angat HEP 246<br />

Magat HEP 360<br />

Pantabangan/Masiway HEP 100<br />

Mas<strong>in</strong>loc CFTPP 600<br />

B<strong>in</strong>ga HEP 100<br />

Ambuklao HEP 75<br />

Bauang DPP 235<br />

Sual CFTPP 1,294<br />

Total Nor<strong>the</strong>rn Luzon Regional Center 3,010<br />

Bataan CCPP 620<br />

Bataan TPP 64<br />

Bataan GT -<br />

Batangas CFTPP 600<br />

Fels PB 1 -<br />

Malaya TPP-NPC<br />

650<br />

Malaya TPP-IPP<br />

Malaya GT-NPC -<br />

TOTAL MMla Regional Center 1,934<br />

BacMan 1 GPP<br />

BacMan 2 GPP<br />

150<br />

Kalayaan PSPP and Caliraya HEP 387<br />

Mak-Ban GPP 410<br />

Pagbilao CFTPP 764<br />

Mauban CFTPP 440<br />

Tiwi GPP 275<br />

P<strong>in</strong>amucan DPP 111<br />

TOTAL South Luzon Regional Center 2,537<br />

Bohol DPP 22<br />

Cebu DPP 2 58<br />

Cebu TPP 2 109<br />

Leyte GPP 1 – Tongonan 112<br />

Pal<strong>in</strong>p<strong>in</strong>on 1 GPP 112<br />

Pal<strong>in</strong>p<strong>in</strong>on 2 GPP 80<br />

PB 105 -<br />

PB 102 8<br />

TOTAL Visayas Regional Center 502<br />

Agus 1 HEP 80<br />

Agus 2 HEP 180<br />

Agus 4 HEP 158<br />

Pulangi 4 HEP 255<br />

PB 117 100<br />

GT 201 & 202 -<br />

TOTAL M<strong>in</strong>danao Regional Center 773<br />

Total 8,756<br />

Total Philipp<strong>in</strong>es 14,905<br />

% to Total Philipp<strong>in</strong>es 59%<br />

Source: Exist<strong>in</strong>g NPC Power Plants <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es, as of 3 May 2002, DOE. Exist<strong>in</strong>g IPP Power Plants <strong>in</strong> <strong>the</strong><br />

Philipp<strong>in</strong>es, as of 24 July 2002, DOE.<br />

The DLF, on <strong>the</strong> o<strong>the</strong>r hand, has yet to be tapped as much as <strong>the</strong> Watershed Rehabilitation<br />

Fund. It has been underutilised, notwithstand<strong>in</strong>g <strong>the</strong> fact that <strong>in</strong>frastructure <strong>pro</strong>jects are<br />

78