11.07.2015 Views

Proposed Submission: Gravesham Local Plan Core Strategy

Proposed Submission: Gravesham Local Plan Core Strategy

Proposed Submission: Gravesham Local Plan Core Strategy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Policy CS18: Climate ChangeFlood Risk5.14.35 With the exception of the previously developed sites along theThames Riverside (see policies CS03, CS04 and CS05), development willbe directed sequentially to those areas at least risk of flooding.5.14.36 Proposals in areas at risk of flooding must be accompanied by aFlood Risk Assessment and, if required, a Flood Risk Management <strong>Plan</strong>to demonstrate that they are adequately defended and safe. <strong>Plan</strong>ningpermission will be refused for schemes which do not pass thesequential and exception tests.5.14.37 The Council will prioritise the maintenance, improvement orreplacement of flood defence infrastructure over other land uses whererelevant.Sustainable Drainage and Surface Water Run-Off5.14.38 The Council will seek to minimise the impact of drainage fromnew development on waste water systems. In particular, the Councilwill:• Require that surface water run-off from all new development hasno greater adverse impact than the existing use;• Require the use of Sustainable Drainage Systems on alldevelopments where technically and financially feasible.Water Demand Management5.14.39 The Council will seek to manage the supply of water in theBorough and reduce the impact of new development on the supply ofpotable water as much as possible. In particular, the Council will:• Require all new homes to be built to at least level 3/4 of the Codefor Sustainable Homes in terms of water use (105 litres per personper day consumption). Where it can be demonstrated that a185

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!