11.07.2015 Views

Proposed Submission: Gravesham Local Plan Core Strategy

Proposed Submission: Gravesham Local Plan Core Strategy

Proposed Submission: Gravesham Local Plan Core Strategy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.4.25 Existing Rosherville North and Lansdowne Square ResidentialArea (sub-area 1.9) consists mainly of an existing residential area that sits ona chalk spine above the River Thames and the former quarries to the east andwest. Lansdowne Square is a conservation area and the southern part of thesub-area lies within the The Overcliffe conservation area. The listedRosherville pier is referred to under sub-area 1.8 above.4.4.26 It is unlikely that this area will be subject to substantial change over theplan period. However, adjoining development should be designed to improveconnectivity and access to the riverside so that existing residents benefit fromimprovements to community facilities to be provided.4.4.27 Imperial Business Estate (sub-area 1.10) mainly comprises anexisting 1980s industrial estate. It is a busy employment area that isanticipated to remain in-situ over the plan period. A small undeveloped areaadjacent to the western end of the former Clifton Marine Parade, the WhiteHouse offices and Imperial Wharf complete the site. Except for possiblerounding-off of employment uses, it is not anticipated that this sub-area will besubject to substantial change over the plan period.Policy CS03: Northfleet Embankment and SwanscombePeninsula East Opportunity Area4.4.28 The Northfleet Embankment and Swanscombe Peninsula EastOpportunity Area is a substantial opportunity for major riversideregeneration in <strong>Gravesham</strong>. Development will bring significant benefitsto existing adjoining residential communities and the borough as awhole through the delivery of new housing and jobs whilst achievingenvironmental improvement, especially in air quality, and a highstandard of design.4.4.29 Any future proposals for the Swanscombe Peninsula EastUndeveloped Area will be subject to a comprehensive masterplanapproach which deals with the issues of flood risk, access, groundconditions, proximity to existing industrial uses, air quality, biodiversity,utilities, navigation and the presence of the HS1 railway line.65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!