27.11.2012 Views

High Resolution 1:10,000 scale Mapping Strategy of Multi ... - NDMA

High Resolution 1:10,000 scale Mapping Strategy of Multi ... - NDMA

High Resolution 1:10,000 scale Mapping Strategy of Multi ... - NDMA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Phase I:<br />

Development<br />

Diagnosis,<br />

<strong>Strategy</strong><br />

Formulation,<br />

and Project<br />

Identification<br />

Phase II:<br />

Action Plan<br />

Preparation<br />

Project<br />

Formulation<br />

Implementation<br />

Hazard-related<br />

objective:<br />

Effect on development<br />

planning activities:<br />

Hazard-related<br />

objective:<br />

Effect on development<br />

planning activities:<br />

Hazard-related<br />

objective:<br />

Effect on development<br />

planning activities:<br />

To assess those hazards present in the study area and identify existing critical<br />

segments or elements <strong>of</strong> production facilities, infrastructure, and settlements<br />

(lifeline network mapping).<br />

To include vulnerability in the determination <strong>of</strong> development potential and<br />

strategy (for example, by identifying floodplains, landslide areas, incipient<br />

desertification).<br />

To identify alternative non-structural and structural mitigation measures in initial<br />

project identification.<br />

Presence <strong>of</strong> hazards will affect the overall strategy. Hazard mitigation should<br />

influence identification <strong>of</strong> sectoral projects, particularly agriculture and<br />

infrastructure.<br />

Presence <strong>of</strong> hazards will affect the identification, type, and location <strong>of</strong><br />

investment projects, which may require modification <strong>of</strong> the lifeline network.<br />

To determine specific mitigation measures for selected investment projects and<br />

identify critical elements <strong>of</strong> lifeline network disaster preparedness activities.<br />

Presence <strong>of</strong> hazards will affect the action plan for project implementation, the<br />

specific site selection <strong>of</strong> investment projects at the local level, the project<br />

engineering design, and the economic feasibility.<br />

To follow through on implementation <strong>of</strong> mitigation measures and disaster<br />

preparedness.<br />

Monitoring <strong>of</strong> natural phenomena for early warning against possible damage,<br />

and formulation <strong>of</strong> future risk assessment and disaster preparedness activities.<br />

Table App 2.1: Phases <strong>of</strong> Hazard assessment panning process<br />

App

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!