Material HandlingCONVENTIONAL RADIAL STACKERSDimensions In Feet Conical Pile VolumeVolume For OneDegree Arc90° StockpileVolume180° StockpileVolume270° StockpileVolumeLiveL R H D R O C.V. Ton Stor.T C.V. Ton C.V. Ton C.V. Ton C.V. Ton40 38.0 14.4 37 19 57 195 264 66 7 9 7901,067 1,385 1,870 1,980 2,67350 47.6 17.5 45 23 70 351 474 118 12 16 1,4491,956 2,547 3,438 3,645 4,92060 57.1 20.5 54 27 84 572 772 193 20 27 2,398 3,237 4,223 5,701 6,049 8,16670 66.6 23.6 62 31 97 871 1,176 294 31 42 3,6904,981 6,509 8,787 9,327 12,59280 76.1 26.7 70 35 111 1,259 1,700 425 46 62 5,3787,261 9,498 12,822 13,617 18,382100 95.1 32.9 86 43 138 2,351 3,173 793 87 117 10,15713,712 17,963 24,250 25,769 34,788125 118.9 40.6 106 53 172 4,426 5,975 1,494 165 223 19,30426,060 34,182 46,145 49,059 66,230150 142.7 48.4 126 63 206 7,461 10,072 2,518 281 379 32,75044,212 58,039 78,352 83,327 112,492198
SUPERSTACKERS — FULL STOC<strong>KPI</strong>LEDimensions In Feet Conical Pile VolumeVolume For OneDegree Arc90° StockpileVolume180° StockpileVolume270° StockpileVolumeLiveL R H D R O C.Y. Ton Stor.T C.Y. Ton C.Y. Ton C.Y. Ton C.Y. TonSS 130 116.7 44 125.3 62.6 179.3 5,810 7,843 2,218 242 326 27,563 37,201 49,316 66,559 71,069 95,917SS 13 6 122.3 42 128 63.6 185.9 5,605 7,567 2,140 231 312 26,386 35,620 47,167 63,673 67,948 91,726SS 150 132.8 51 152 75.7 208.5 9,964 13,452 3,804 380 511 44,164 59,442 78,364 105,432 112,564 151,422SS 170 158.3 60 160.3 80.2 238.5 14,064 18,986 5,369 502 677 59,224 79,952 104,389 140,925 149,554 201,898SUPERSTACKERS COMPLETELY DESEGREGATEDDimensions In Feet Conical Pile VolumeVolume For OneDegree Arc90° StockpileVolume180° StockpileVolume270° StockpileVolumeLiveL R H D R O C.Y. Ton Stor.T C.Y. Ton C.Y. Ton C.Y. Ton C.Y. TonSS 130 107 33 87.5 43.75 150.75 2,555 3,314 828 101 136 11,600 15,527 20,645 27,740 29,690 39,953SS 136 112.2 28.4 75.5 37.75 149.95 1,572 2,122 530 78 105 8,619 11,635 15,666 21,148 22,713 30,661SS 150 121 37 97.5 48.75 169.75 3,384 4,569 1,142 141 190 16,056 21,669 28,728 38,769 41,400 55,869Material Handling199
- Page 2 and 3:
Kolberg-Pioneer, Inc.Johnson Crushe
- Page 4 and 5:
FORWARDAggregate production is base
- Page 6 and 7:
4TABLE OF CONTENTSAngle of Repose/S
- Page 8 and 9:
Volume.............................
- Page 10 and 11:
GENERAL INFORMATION ON THE INERTMIN
- Page 12 and 13:
PROCESSING OF AGGREGATESMuch of the
- Page 14 and 15:
100SIEVE ANALYSIS ENVELOPEPercent p
- Page 16 and 17:
inchesTYPICAL GRADATION CURVESFOR G
- Page 18 and 19:
APRON FEEDERSParticularly suited fo
- Page 20 and 21:
APPROXIMATE PER HOUR CAPACITIES OF
- Page 22 and 23:
VIBRATING FEEDERS—APPROXIMATE CAP
- Page 25 and 26:
LEGENDARY JAW CRUSHERCrushin gFor a
- Page 27 and 28:
LEGENDARY JAW CRUSHERS—HORSEPOWER
- Page 29 and 30:
VANGUARD JAW CRUSHERSHORSEPOWER REQ
- Page 31 and 32:
PRIMARY IMPACT CRUSHERS(New Holland
- Page 33 and 34:
ANDREAS-STYLEIMPACT CRUSHERSCrushin
- Page 35 and 36:
CONE CRUSHERSCrushin gTrack-Mounted
- Page 37 and 38:
KODIAK PLUS ANDLS CONE CRUSHERSCrus
- Page 39 and 40:
11. Crusher cone head is properly b
- Page 41 and 42:
KODIAK 200 PLUS MANGANESECONFIGURAT
- Page 43 and 44:
ProductSizeKODIAK 300 PLUS CONE CRU
- Page 45 and 46:
Kodiak 300 PlusMediumChamberwithFee
- Page 47 and 48:
ProductSizeKODIAK 400 PLUS CONE CRU
- Page 49 and 50:
Kodiak 400 PlusMediumChamberABCCrus
- Page 51 and 52:
Kodiak 500 PlusExtra CoarseChamberA
- Page 53 and 54:
Kodiak 500 PlusFineChamberABCCrushi
- Page 55 and 56:
KODIAK PLUS SERIES CONE CRUSHER PRO
- Page 57 and 58:
KODIAK PLUS SERIES CONE CRUSHER PRO
- Page 59 and 60:
1200 LS / 1400 LS CONE CRUSHER PROJ
- Page 61 and 62:
LS SERIES CRUSHER MANGANESECONFIGUR
- Page 63 and 64:
KPI-JCI 1200LS V-BELT DRIVE DATA -
- Page 65 and 66:
1400LSMediumFineChamberCrushin gBow
- Page 67 and 68:
ROLL CRUSHERSAPPROXIMATE TWIN AND T
- Page 69 and 70:
TWIN ROLL CRUSHERSRECOMMENDED HPSiz
- Page 71 and 72:
TRIPLE ROLL CRUSHERSRECOMMENDED HPS
- Page 73 and 74:
CAPACITY MULTIPLIERS FOR OPEN CIRCU
- Page 75 and 76:
VERTICAL SHAFT IMPACT CRUSHERCrushi
- Page 77 and 78:
VERTICAL SHAFT IMPACT CRUSHER—Spe
- Page 79 and 80:
Typical Limestone inStandard Config
- Page 81 and 82:
Typical Limestone inStandard Config
- Page 83 and 84:
VERTICAL SHAFT IMPACT CRUSHERCRUSHI
- Page 85 and 86:
FAST TRAX ®HiGH FREQUENCY SCREEN P
- Page 87 and 88:
FAST TRAX ® KODIAK PLUS CONE PLANT
- Page 89 and 90:
GLOBAL TRACK SCREENING PLANTSTracks
- Page 91 and 92:
GLOBAL TRACK JAW PLANTSTracksThe GT
- Page 93 and 94:
GLOBAL TRACK CONVEYORTracksThe GT36
- Page 95 and 96:
The ideal gradation is seldom, if e
- Page 97 and 98:
GRADING REQUIREMENTS FOR COARSE AGG
- Page 99 and 100:
PERCENT PASSING01020304010090807060
- Page 101 and 102:
FM AND SEThe factor called Fineness
- Page 103 and 104:
LOG WASHERSPurpose: In the aggregat
- Page 105 and 106:
COARSE MATERIAL WASHERSPurpose: The
- Page 107 and 108:
BLADEMILLSPurpose: Similar in desig
- Page 109 and 110:
FINE MATERIAL WASHINGAND CLASSIFYIN
- Page 111 and 112:
FINE MATERIAL WASHERSPurpose: Fine
- Page 113 and 114:
FINE MATERIAL WASHERSRAKING & OVERF
- Page 115 and 116:
CLASSIFICATION METHODSAPPLIED TO FI
- Page 117 and 118:
For Solids SG 2.65-2.70 (sand, grav
- Page 119 and 120:
While a particle is in suspension,
- Page 121 and 122:
SAND CLASSIFYING TANKSPurpose: Clas
- Page 123 and 124:
Sand discharge is controlled via a
- Page 125 and 126:
CLASSIFYING TANK WEIR OVERFLOW RATE
- Page 127 and 128:
to the percentage settings at each
- Page 129 and 130:
1800 SERIESSCREENING/WASHING PLANTS
- Page 131 and 132:
Application: Several important elem
- Page 133 and 134:
NOTES:Washin g/Classifyin g131
- Page 135 and 136:
The Vari-Vibe ® screens are ideal
- Page 137 and 138:
2618VM CAPACITY(Modified 6’ x 18
- Page 139 and 140:
TROUBLESHOOTING GUIDE:HIGH FREQUENC
- Page 141 and 142:
NOTES:Screenin g139139
- Page 143 and 144:
As material flows over a vibrating
- Page 145 and 146:
HORIZONTAL SCREENS are utilized as
- Page 147 and 148:
ly producing oval screening motion
- Page 149 and 150: VSMA FACTORS FOR CALCULATING SCREEN
- Page 151 and 152: SCREEN MATRIXECONOMYSLOPE(DEGREES)M
- Page 153 and 154: INCLINE SCREENSSeries 70: All Serie
- Page 155 and 156: 22° INCLINE SCREENSThese economy s
- Page 157 and 158: INCLINE SCREENSIncline screens feat
- Page 159 and 160: DUAL SHAFTINCLINED SCREENSIn additi
- Page 161 and 162: HORIZONTAL VIBRATING SCREENSHorizon
- Page 163 and 164: MEDIUM SCALPER SCREENSThe Medium Sc
- Page 165 and 166: MULTI-ANGLE SCREENS20 °20 °20 °1
- Page 167 and 168: COMBO SCREENPATENT PENDINGAdjustabl
- Page 169 and 170: FRACTIONATING RAPPrice increases in
- Page 171 and 172: F1 In 1973, crude oil prices escala
- Page 173 and 174: ago. Current specificationsallow th
- Page 175 and 176: PROCESSING RAP MATERIALHot mix asph
- Page 177 and 178: cost of crushing significantly,sinc
- Page 179 and 180: filler and a portion of thepolymeri
- Page 181 and 182: CONCLUSIONWith each passing year, t
- Page 183 and 184: . Material characteristics can affe
- Page 185 and 186: 9°ELEVATION IN FEET12°15°18°CON
- Page 187 and 188: CONICAL STOCKPILE CAPACITYVolumeVol
- Page 189 and 190: V 2 = Volume of Stockpile Segment f
- Page 191 and 192: 4. Conveyor WidthThere are a number
- Page 193 and 194: FLOWABILITY—ANGLE OF SURCHARGE—
- Page 195 and 196: HOW TO DETERMINE CONVEYOR BELT SPEE
- Page 197 and 198: Series 13: Portable, standard-duty,
- Page 199: SUPERSTACKERSTOCKPILE VOLUMESCONVEN
- Page 203 and 204: HOPPER / FEEDERS• Gravity feed ho
- Page 205 and 206: RAILROAD BALLASTBallast is a relati
- Page 207 and 208: MOTOR WIRING AT STANDARD SPEEDSFrom
- Page 209 and 210: DIMENSIONS, IN INCHES, OFELECTRIC M
- Page 211 and 212: GENERATOR SIZE TO POWER ELECTRICMOT
- Page 213 and 214: VELOCITY OF FLOW IN PIPESVELOCITY O
- Page 215 and 216: FLOW OVER WEIRSSettling Tanks, Clas
- Page 217 and 218: SPRAY NOZZLESFOR VIBRATING SCREENST
- Page 219 and 220: TYPE WF CAPACITY CHART—Nozzle Num
- Page 221 and 222: WEIGHTS AND MEASURES—UNITED STATE
- Page 223 and 224: WEIGHTS AND MEASURES—METRIC (Cont
- Page 225 and 226: APPROXIMATE WEIGHT OF MATERIALSWeig
- Page 227 and 228: APPROXIMATE WEIGHTS IN POUNDS PER C
- Page 229 and 230: AREA AND CIRCUMFERENCE OF CIRCLES (
- Page 231 and 232: THEORETICAL WEIGHTS OF STEEL PLATES
- Page 233 and 234: STEEL WIRE GAUGE DATABirmingham Wir
- Page 235 and 236: SPEED RATIOSSpeed ratios and groups
- Page 237 and 238: APPROX. SAFE LOAD FOR CHAINS AND WI
- Page 239 and 240: Lbs.PerSq.TONS OF MATERIAL REQUIRED
- Page 241 and 242: APPROXIMATE WEIGHT IN POUNDS PER SQ
- Page 243 and 244: DEFINITIONS AND TERMSAdmixtures—S
- Page 245 and 246: DEFINITIONS AND TERMS (Continued)Gr
- Page 247 and 248: DEFINITIONS AND TERMS (Continued)Sa
- Page 249 and 250: NOTES247
- Page 251 and 252:
CONTACT INFORMATIONKPI700 West 21st