13.07.2015 Views

Human and Ecological Risk Assessment - Earthjustice

Human and Ecological Risk Assessment - Earthjustice

Human and Ecological Risk Assessment - Earthjustice

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix CAttachment C-3: Climate Center AssignmentsClimate Center Assignments (continued)Plant Climate Center Explanation If Not Closest Climate CenterJ M StuartCincinnati, OHJ R WhitingJack McDonoughPut-in-Bay, OHAtlanta, GAJack Watson Tallahassee, FL Closest Met Station (New Orleans) receives much more precipitation (5.06” out of range) than the sitelocation. http://www.weather.com predicted average precipitation at plant location to be 65.2. Used thirdclosest because its average was closest.James H Miller JrJim BridgerAtlanta, GAL<strong>and</strong>er, WYJohn E Amos Cincinnati, OH The two closest Met Stations are out of the site’s precipitation range. Used third closest Met Station because5-year averages fell within expected precipitation range for the plant. Also average precipitation for thesecond closest Met Station was nearest to http://www.weather.com average.John SevierJohnsonvilleJoliet 29KeystoneKillen StationKingstonKraftL V SuttonLansingLaramie R StationLawrence ECLeeLel<strong>and</strong> OldsLon WrightLouisaMarionMarshallKnoxville, TNNashville, TNChicago, ILPittsburgh, PACincinnati, OHKnoxville, TNCharleston, SCCharleston, SCMadison, WICheyenne, WYTopeka, KSGreensboro, NCBismarck, NDNorth Omaha, NEDes Moines, IAEast St. Louis, ILGreensboro, NC(continued)April 2010–Draft EPA document.C-3-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!