13.07.2015 Views

Combining submerged membrane technology with anaerobic and ...

Combining submerged membrane technology with anaerobic and ...

Combining submerged membrane technology with anaerobic and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 55.3. Material <strong>and</strong> methods5.3.1. Experimental set-up <strong>and</strong> operating strategyA 176 L bioreactor (figure 5.1) was operated at ambient temperature (17-23 ºC). A120 L volume UASB system was used for the first methanogenic stage. The effluent of theUASB reactor was led to an aerobic biofilm chamber (36 L), <strong>with</strong> biomass growing ontoplastic support <strong>and</strong> in suspension. 18.5 L (50% of the effective volume) of Kaldnes K3support were added in this chamber. Finally, the <strong>membrane</strong> filtration was carried out in a20 L aerobic chamber, where a <strong>membrane</strong> module Zenon ZW10 <strong>with</strong> a surface area of 0.9m 2 was employed. This module consisted of PVDF hollow-fibre <strong>membrane</strong>, <strong>with</strong> a poresize of 0.04 µm. The <strong>membrane</strong> was operated in cycles of 7.5 min <strong>with</strong> a permeationperiod of 7 min <strong>and</strong> a backwashing period of 0.5 min. The filtration chamber was aerated inorder to minimize <strong>membrane</strong> fouling. The specific air dem<strong>and</strong> (SAD m) applied to the<strong>membrane</strong> was 0.7 Nm 3·m -2·h -1 . An internal recirculation between filtration <strong>and</strong> aerobicstages was implemented in the MBR (R=1). The operation of the system was controlled bya PLC (Siemens S7-200) connected to a computer. Trans-<strong>membrane</strong> Pressure (TMP) datawas measured <strong>with</strong> an analogue pressure sensor (Efector500 PN-2009) <strong>and</strong> collected inthe PC via an analogue PLC module Siemens EM 235.Table 5.1. Main operational conditions of the bioreactor during the different periods.Period days Feeding Recirculation 1 Ratio Support 2I 0-175 Synthetic yes 0.15 yesII 176-260 Synthetic no - yesIII 261-540 Synthetic yes 0.15-0.075 yesIV 541-569 Synthetic no - yesV 570-635 Synthetic no - noVI 636-680 Synthetic yes 0.075 yesVII 700-875Synthetic +aerobic sludge 3no (fed) - yes1 Sludge recirculation between aerobic biofilm chamber <strong>and</strong> UASB reactor2 Plastic carriers Kaldnes K3 in the aerobic biofilm chamber3 Aerobic sludge was fed between days 769 <strong>and</strong> 841132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!