06.12.2012 Views

PHASE II REPORT - Caltrans

PHASE II REPORT - Caltrans

PHASE II REPORT - Caltrans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.3 If the mix does not break, the test is terminated at 10 minutes mixing and observations<br />

made as to greater than or less than the specification level.<br />

5.0 SIGNIFICANCE AND USE<br />

5.1 This test method will measure compatibility and setting parameters of asphalt emulsions<br />

and mineral aggregates.<br />

5.2 This procedure is suggested for establishing design criteria of the mix system. In<br />

addition, it provides a means of quality control during the production of asphalt emulsion,<br />

mineral aggregates, and additives.<br />

5.3 This method facilitates research and development of new combinations of raw materials.<br />

5.4 This method documents the temperature influences on the consistency of the mixed<br />

materials.<br />

5.5 This method measures the affect of compositional changes on mixing.<br />

6.0 APPARATUS<br />

6.1 The AMT System set-up is illustrated in Figure A.2.<br />

6.2 IKA Werke EUROSTAR power control-visc, R-1826 Plate Stand, R-182 Boss Head, RH-<br />

3 Strap Clamp<br />

6.3 Velp Scientific stirring shaft with propeller: 3 stainless steel blades, 2.4 inches (61 mm),<br />

shaft 15.75 x 0.25 inches (400 X 6.4 mm)<br />

6.4 Mixing bowl: stainless steel, 10 oz, 2.75 inches (70 mm) tall, 2 inches (50.8 mm) radius<br />

with a rounded flat bottom (Vollrath #99637)<br />

6.5 Balance accurate to 0.1 g<br />

98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!