8.0 PROCEDURE<br />

8.1 Maintain the aggregate, emulsion, water, and additives at the test temperature<br />

77°F (25°C).<br />

8.2 Set up the IKA Werke EUROSTAR ready for test with the control system ready<br />

on the correct measurement configuration. See the Appendix for establishing the signal<br />

flow.<br />

8.3 The amounts of materials shall be quantified by a mix design, from TB-113 or in<br />

a matrix to determine specific mix effects.<br />

8.4 Add 300g of aggregate into the mixing bowl.<br />

8.5 Add the required amount of solid additives, when applicable, and mix well by<br />

hand.<br />

8.6 Add pre-wet water, followed by the liquid additive, when applicable, and mix well<br />

by hand. Pre-wet water refers to the amount of water added to dry aggregate to ensure<br />

that it is moist prior to mix it with emulsion or liquid additive.<br />

8.7 Add the emulsion and quickly blend with the aggregate within 5-10 seconds.<br />

8.8 Within 5 seconds, quickly place the bowl and mix contents in the EUROSTAR,<br />

such that the bottom of the propeller is 0.04-0.08 inches (1-2 mm) above the inside<br />

bottom of the bowl.<br />

8.9 Start the mixer manually and mix for 5 seconds<br />

8.10 Start test and monitor torque.<br />

8.11 Switch off test at 10 minutes or when torque rises to a maximum and then falls<br />

off, which ever comes first.<br />

100