8.6 Weigh 1300 g of aggregate into the mixing bowl. Typically, 1300 g of aggregate<br />

should be enough aggregate to slightly over-fill the specimen mold during casting. Using a<br />

spoon mix in prescribed amount of dry set additive to the aggregate and mix for 1 minute or until<br />

uniformly distributed. Add the pre-wet amount of water and mix again for 1 minute or until<br />

uniformly distributed. Add the liquid set additive(s) to the mix and mix for 1 minute or until<br />

uniformly distributed. Finally, add the predetermined asphalt emulsion and mix for 1 minute or<br />

until uniformly distributed. Immediately pour into the centered specimen casting mold.<br />

8.7 Strike off the slurry mixture level with the top of the mold with a minimum of<br />

manipulation. Use a sawing motion with the wooden dowel and even out the surface as seen in<br />

Figure 8.3. Discard excess material. Remove the mold and cure under prescribed conditions of<br />

duration, temperature, and humidity.<br />

Figure B.5: Surface Preparation<br />

8.8 After the prescribed curing conditions, record the weight of the specimen<br />

immediately before placing into the abrasion pan. If there is excess water along the edges of<br />

the specimen and surface of the casting plate, carefully remove by dabbing with an absorbent<br />

paper towel before recording the initial weight.<br />

9.0 TEST PROCEDURE<br />

9.1 Place the cured specimen into the abrasion pan. Clamp the specimen plate to the<br />

inside of the abrasion pan; tighten the quick clamps to press against the specimen plate that is<br />

in the abrasion pan on the mounting plate.<br />