David Peshkin will take the lead in developing the visual aids and the Instructor’s Guide.<br />

Development assistance will be provided by Steve Seeds and Dragos Andrei. Jim Moulthrop<br />

will serve in both an advisory and review capacity.<br />

5.3. PRE-JOB TRAINING MODULE<br />

It is anticipated that this project will result in several significant modifications to the slurry/microsurfacing<br />

construction processes as well as mix design procedures. Consequently, the purpose<br />

of this effort is to develop a pre-job training module, which will include a section on project<br />

safety, so that the “must know” information can be shared with agency and contractor<br />

personnel. This information will be extracted from the Reference Manual and a stand-alone<br />

document prepared for presentation and discussion during a meeting (similar to a preconstruction<br />

meeting) that will be held prior to the beginning of a slurry surfacing or microsurfacing<br />

project. In addition, an easy to use, pocketsize guidebook will be prepared so that<br />

both agency and contractor personnel can take it into the field.<br />

Jim Moulthrop will oversee and participate heavily in this effort. He will be assisted by Dragos<br />

Andrei and David Peshkin.<br />

5.4 TASK 3: CONSTRUCTION OF PILOT PROJECTS FOR FIELD<br />

VALIDATION OF DESIGN PROCEDURES<br />

The purpose of this work plan is to develop guidelines for the construction and evaluation of test<br />

sections for the validation of slurry seal and micro-surfacing mix design procedures. These<br />

guidelines indicate the type of equipment used and evaluation of the construction of test<br />

sections. A factorial for the determination of the site locations including test section layout has<br />

also been developed. Finally, a monitoring plan has been developed to determine<br />

constructability, and both short-term and long-term performance of the test sections.<br />

The LTPP program developed a study to determine the long-term performance of various<br />

maintenance treatments. (1) Seven States participated in the construction of these test sections.<br />

The layout of these sections along with their site selection provided valuable information for the<br />

economical evaluation of the test sections. A similar plan is proposed for the validation of the<br />

slurry and micro-surfacing mix design procedure.<br />

Fortunately, there has been widespread support for this study, which includes agencies from the<br />

States noted in Chapter 1. It is hoped that additional States may add their support before the<br />

conclusion of this study. These States provide a diverse set of climatic conditions ideally suited<br />