Cardinia Shire Council - Annual Report 2017-18
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Performance indicators<br />
Roads<br />
Service indicator 2014–15 2015–16 2016–17 <strong>2017</strong>–<strong>18</strong> Material variation<br />
Satisfaction of use<br />
Sealed local road requests<br />
[Number of sealed local road requests/<br />
Kilometres of sealed local roads]<br />
Condition<br />
Sealed local roads below the intervention<br />
level<br />
[Number of kilometres of sealed local roads<br />
below the renewal intervention level set by<br />
<strong>Council</strong>/Kilometres of sealed local roads]<br />
x100<br />
Service cost<br />
Cost of sealed local road reconstruction<br />
[Direct cost of sealed local road<br />
reconstruction/Square metres of sealed<br />
local roads reconstructed]<br />
Service cost<br />
Cost of sealed local road resealing<br />
[Direct cost of sealed local road resealing/<br />
Square metres of sealed local roads<br />
resealed]<br />
Satisfaction<br />
Satisfaction with sealed local roads<br />
[Community satisfaction rating out of 100<br />
with how <strong>Council</strong> has performed on the<br />
condition of sealed local roads]<br />
44.23 44.15 55.97 80.58 <strong>Council</strong> are<br />
responsible for<br />
maintaining 690<br />
kilometres of sealed<br />
roads. An increase<br />
in sealed road<br />
related complaints<br />
in <strong>2017</strong>–<strong>18</strong> was the<br />
result of a number<br />
of roads requiring<br />
rehabilitating. Prior to<br />
this occurring, these<br />
roads experienced a<br />
higher than normal<br />
increase in customer<br />
complaints. Weather<br />
events, particularly in<br />
low lying parts of the<br />
shire also contributed<br />
to increased<br />
maintenance and<br />
customer complaints.<br />
97.25% 98.62% 97.61% 96.52%<br />
$200.82 $74.79 $31.92 $38.83 Reconstruction<br />
rates appear to<br />
have increased in<br />
response to the<br />
sheer increase in<br />
volume of work being<br />
undertaken within<br />
the industry.<br />
$16.36 $7.26 $10.64 $14.47 The resurfacing<br />
program for <strong>2017</strong>–<br />
20<strong>18</strong> had a higher<br />
proportion of asphalt<br />
overlays than last<br />
year, which was<br />
dominated by spray<br />
seal treatments that<br />
have a unit rate cost<br />
approximately 25%<br />
less than that for<br />
asphalt overlays.<br />
55 57 54 55<br />
Introduction Year in review Our <strong>Council</strong> Our organisation Our performance<br />
Governance and<br />
management<br />
Performance<br />
statement<br />
Financial<br />
statements<br />
83