25.12.2012 Views

TT CME Gateway System Administration Manual - Trading ...

TT CME Gateway System Administration Manual - Trading ...

TT CME Gateway System Administration Manual - Trading ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UDS Supported Order<br />

Types<br />

4 Configuring Market Data<br />

• If accepted, the exchange multicasts the security definitions for the<br />

created Combo or Covered strategy to the Price Server.<br />

• The Price Server creates the Combo or Covered UDS contract and makes<br />

it available for trading and quoting.<br />

The following order types are supported for Covered and Combo UDS<br />

instruments:<br />

• Limit<br />

• Market-Limit<br />

The <strong>CME</strong> Group supports the following order qualifiers for a Combo UDS:<br />

• GTD<br />

• GTC<br />

• FAK<br />

Client Application Impact In addition to the risk limits you can establish in Guardian, P&L calculations and<br />

risk management for trading UDS contracts are supported by the following<br />

minimum versions of these <strong>TT</strong> clients:<br />

• X_TRADER ® 7.6<br />

• X_RISK ® 7.3.2<br />

• X_STUDY 7.2<br />

• FMDS<br />

• <strong>TT</strong> USER SETUP 7.0.3<br />

Covered User-Defined Strategies can be created and made available for trading if<br />

you decide to do so. Setting the ProcessCoveredUDS parameter to ALL in the<br />

hostinfo.cfg file will download all Covered UDS security definitions, including<br />

Covered User-Defined Strategies with multiple Futures legs. However, the client<br />

trading applications in your trading environment will not correctly calculate risk<br />

for the multiple Futures legs of the Covered UDS. Refer to the following example.<br />

Example: A Covered UDS defined with multiple futures legs<br />

Created as...<br />

+1x6E Nov09 C11100:-.5x6E Dec09:+.5x6E Nov09<br />

Will be incorrectly risk checked as...<br />

+1x6E Nov09 C11100:-.5x6E Dec09:+50x6E Nov 09<br />

This example illustrates that risk calculations for one of the Futures legs will be<br />

incorrectly multiplied by a factor of 100, causing traders to surpass their risk<br />

limits.<br />

78 <strong>TT</strong> <strong>CME</strong> <strong>Gateway</strong> <strong>System</strong> <strong>Administration</strong> <strong>Manual</strong><br />

<strong>Trading</strong> Technologies International, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!