10.01.2013 Views

Crown Land: Indicators and Statistics - Ministry of Forests

Crown Land: Indicators and Statistics - Ministry of Forests

Crown Land: Indicators and Statistics - Ministry of Forests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crown</strong> <strong>L<strong>and</strong></strong>:<br />

<strong>Indicators</strong> <strong>and</strong><br />

96 <strong>Statistics</strong> Report<br />

Box 4 Roads <strong>and</strong> Corridors on <strong>Crown</strong> <strong>L<strong>and</strong></strong><br />

The length <strong>and</strong> density <strong>of</strong> roads <strong>and</strong> corridors provide measures <strong>of</strong> the degree to which <strong>Crown</strong> l<strong>and</strong><br />

has been affected by human activity, since roads are constructed to provide access for urban <strong>and</strong><br />

industrial development.<br />

There are a total <strong>of</strong> 821,848 kilometres <strong>of</strong> roads <strong>and</strong> corridors (including railways, transmission lines,<br />

pipelines <strong>and</strong> seismic lines) throughout BC, on both <strong>Crown</strong> <strong>and</strong> private l<strong>and</strong>. Table 15 shows the length<br />

<strong>and</strong> density <strong>of</strong> roads <strong>and</strong> corridors, <strong>and</strong> seismic lines, in each sub-region.<br />

Increasing road <strong>and</strong> corridor<br />

length <strong>and</strong> density may have the<br />

following social, economic <strong>and</strong><br />

environmental outcomes:<br />

• Providing access to<br />

resources;<br />

• Providing access to rural<br />

communities;<br />

• Fragmenting <strong>and</strong> altering<br />

wildlife habitat;<br />

• Isolating wildlife<br />

populations;<br />

• Changing water quality in<br />

nearby water bodies; <strong>and</strong>/or<br />

• Increasing the widespread<br />

distribution <strong>of</strong> exotic species.<br />

Table 15 Road <strong>and</strong> Corridor Length <strong>and</strong> Density by Sub-region<br />

Sub-region<br />

Road &<br />

Corridor<br />

Length<br />

(km)<br />

Seismic<br />

Line<br />

Length<br />

(km)<br />

Road &<br />

Corridor<br />

Density<br />

(km/<br />

km 2 )<br />

Seismic<br />

Line<br />

Density<br />

(km/<br />

km 2 )<br />

Peace 118,348 162,029 0.7 0.9<br />

Thompson-<br />

Okanagan<br />

99,838 0 1.3 0<br />

Cariboo 93,184 0 1.1 0<br />

West Coast 92,368 0 1.0 0<br />

Omineca 88,090 2,411 0.6 0<br />

Kootenay 73,776 418 0.9 0<br />

Skeena 47,000 2,028 0.2 0<br />

South Coast 42,356 0 1.0 0<br />

TOTAL 654,960 166,886 0.7 0.2<br />

Source: Hectares BC<br />

Table 15 makes the distinction between roads <strong>and</strong> corridors, <strong>and</strong> seismic lines, because seismic lines are<br />

more temporary. Seismic lines are linear clearings in forested areas that facilitate a method <strong>of</strong> oil <strong>and</strong> gas<br />

exploration that uses small explosive charges or seismic vibrators to create a pattern <strong>of</strong> shock waves that<br />

are reflected by the underground geology. The interpretation <strong>of</strong> the reflected shockwaves can identify<br />

petroleum-bearing geological zones. Seismic lines are generally used once <strong>and</strong> then allowed to revert back<br />

to the natural l<strong>and</strong>scape (as much as possible).<br />

The Peace sub-region has the largest number <strong>of</strong> roads, corridors <strong>and</strong> seismic lines in the province, <strong>and</strong> also<br />

the greatest density. In the Peace, 58% or 162,029 kilometres <strong>of</strong> these linear features are seismic lines.<br />

Under the <strong>L<strong>and</strong></strong> Act, tenures are issued for a variety <strong>of</strong> linear uses, including railways, roadways, power lines,<br />

transmission lines, <strong>and</strong> gas <strong>and</strong> oil pipelines.<br />

Between 2000 <strong>and</strong> 2009, roads <strong>and</strong> corridors accounted for 15,843 tenures, or 27% <strong>of</strong> all tenures issued<br />

in BC. These tenures encompass 255,980 hectares <strong>of</strong> <strong>Crown</strong> l<strong>and</strong>, or 1% <strong>of</strong> all <strong>Crown</strong> l<strong>and</strong> tenured during<br />

this period.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!