6.3 Suspended Ceiling Design Process - Bilkent University
6.3 Suspended Ceiling Design Process - Bilkent University
6.3 Suspended Ceiling Design Process - Bilkent University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Building Type<br />
Building Style<br />
Tenancy Type<br />
Floor Area<br />
Building Structure Layout<br />
Number of Floors Served above Main Termin<br />
Average Interfloor Distance<br />
Passenger Arrival Rate<br />
Building Population<br />
Uppeak Interval<br />
Average Number of Passengers per Trip<br />
Contract Capacity<br />
Average Highest Call Reversal Floor<br />
Average Number of Stops<br />
Contract Speed<br />
Single Floor Transit Time<br />
Car Door Opening Configuration<br />
Door Opening/Closing Time<br />
Time Consumed when Stopping<br />
With Gearing<br />
Floor Cycle Time<br />
Average Passenger Transfer Time<br />
Round Trip Time<br />
Uppeak Handling Capacity<br />
Number of Elevators<br />
Car Door Width<br />
Elevator Type<br />
Car Width<br />
Car Depth<br />
Car Grouping<br />
Structural Frame LH Side Clearance<br />
Structural Frame RH Side Clearance<br />
Structural Frame Rear Clearance<br />
Structural Frame Front Clearance<br />
Landing Clearance<br />
Hoistway Width<br />
Hoistway Depth<br />
Car Height<br />
Hoistway Finishes<br />
Machine Room Depth<br />
Machine Room Width<br />
Machine Room Height<br />
Machine Room Headroom<br />
Machine Room Position<br />
Clear Overhead<br />
Pit Headroom<br />
Hoistway Height<br />
Type of Guide Rails<br />
Pit Sump Recess Length<br />
Pit Sump Recess Width<br />
Pit Sump Recess Depth<br />
Guide Rail Fixing Positions<br />
Car Panel Finish<br />
Car <strong>Ceiling</strong> Finish<br />
Car Floor Finish<br />
Car Door Finish<br />
Car Lighting Type<br />
With Handrail<br />
With Car Mirror<br />
Car Operating Station Display Type<br />
Car Operating Station Panel Type<br />
Car Operating Station Panel Finish<br />
Car Handrail Type<br />
Car Handrail Surface Finish<br />
Car Mirror Type<br />
Car Mirror Position<br />
Car Mirror Width<br />
Car Mirror Height<br />
Landing Fixtures<br />
Counterweight<br />
Guide Rail Support Centres<br />
Guide Rail Support Loads<br />
Lifting Beam Position<br />
Buffer Position<br />
Lifting Beam Load<br />
Buffer Load<br />
Lifting Beam Size<br />
Pit Foundation Size<br />
1 2 3 4 5 6 7 9 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 34 35 36 37 38 30 40 42 43 44 45 46 47 48 39 41 49 50 51 52 53 54 55 56 62 66 57 63 64 65 67 68 58 59 60 61 69 70 77 78 74 71 76 72 75 73<br />
Building Type 1 1<br />
Building Style 2 2<br />
Tenancy Type 3 1 3<br />
Floor Area 4 4 1 1<br />
Building Structure Layout 5 5 1 1 1<br />
Number of Floors Served above Main Termina 6 6<br />
Average Interfloor Distance 7 7<br />
Passenger Arrival Rate 9 1 9<br />
Building Population 8 1 1 1 1 8<br />
Uppeak Interval 10 1 10 1 1<br />
Average Number of Passengers per Trip 11 1 1 11 1<br />
Contract Capacity 12 1 1 12<br />
Average Highest Call Reversal Floor 13 1 1 1 13<br />
Average Number of Stops 14 1 14<br />
Contract Speed 15 1 1 1 15 1<br />
Single Floor Transit Time 16 1 1 1 16<br />
Car Door Opening Configuration 17 1 17<br />
Door Opening/Closing Time 18 1 18<br />
Time Consumed when Stopping 19 1 19 1<br />
With Gearing 20 1 20<br />
Floor Cycle Time 21 1 1 21<br />
Average Passenger Transfer Time 22 1 1 22 1 1 1<br />
Round Trip Time 23 1 1 1 1 1 1 23<br />
Uppeak Handling Capacity 24 1 1 1 24 1<br />
Number of Elevators 25 1 1 1 1 25 1 1 1 1<br />
Car Door Width 26 1 1 1 26<br />
Elevator Type 27 1 1 1 27<br />
Car Width 28 1 1 1 1 28 1<br />
Car Depth 29 1 1 1 29 1<br />
Car Grouping 31 1 1 1 1 31<br />
Structural Frame LH Side Clearance 32 32<br />
Structural Frame RH Side Clearance 33 33<br />
Structural Frame Rear Clearance 34 34<br />
Structural Frame Front Clearance 35 35<br />
Landing Clearance 36 36<br />
Hoistway Width 37 1 1 1 1 1 1 37<br />
Hoistway Depth 38 1 1 1 1 1 1 1 38<br />
Car Height 30 1 1 1 1 30<br />
Hoistway Finishes 40 1 1 40<br />
Machine Room Depth 42 1 1 1 42<br />
Machine Room Width 43 1 1 1 43<br />
Machine Room Height 44 1 1 44<br />
Machine Room Headroom 45 1 1 45<br />
Machine Room Position 46 1 1 1 1 1 46<br />
Clear Overhead 47 1 1 1 47<br />
Pit Headroom 48 1 1 48<br />
Hoistway Height 39 1 1 1 1 1 1 1 1 1 39<br />
Type of Guide Rails 41 1 1 1 41<br />
Pit Sump Recess Length 49 1 1 1 1 49<br />
Pit Sump Recess Width 50 1 1 1 1 50<br />
Pit Sump Recess Depth 51 1 1 51<br />
Guide Rail Fixing Positions 52 1 1 1 1 1 52<br />
Car Panel Finish 53 1 1 1 1 1 53<br />
Car <strong>Ceiling</strong> Finish 54 1 1 1 1 54<br />
Car Floor Finish 55 1 1 1 1 55<br />
Car Door Finish 56 1 1 1 56<br />
Car Lighting Type 62 1 1 1 62<br />
With Handrail 66 1 1 66<br />
With Car Mirror 57 1 1 1 57<br />
Car Operating Station Display Type 63 1 1 1 1 1 63<br />
Car Operating Station Panel Type 64 1 1 1 1 1 64<br />
Car Operating Station Panel Finish 65 1 1 1 1 65<br />
Car Handrail Type 67 1 1 1 67<br />
Car Handrail Surface Finish 68 1 1 1 1 68<br />
Car Mirror Type 58 1 1 1 58<br />
Car Mirror Position 59 1 1 1 1 59<br />
Car Mirror Width 60 1 1 60<br />
Car Mirror Height 61 1 1 61<br />
Landing Fixtures 69 1 1 1 1 1 1 69<br />
Counterweight 70 1 1 1 1 1 1 1 1 1 1 1 1 70<br />
Guide Rail Support Centres 77 1 1 1 1 1 77<br />
Guide Rail Support Loads 78 1 1 1 1 78<br />
Lifting Beam Position 74 1 1 1 1 74<br />
Buffer Position 71 1 1 1 1 71<br />
Lifting Beam Load 76 1 1 1 1 1 1 1 1 1 1 1 1 76<br />
Buffer Load 72 1 1 1 1 1 1 1 1 1 1 1 1 72<br />
Lifting Beam Size 75 1 1 75<br />
Pit Foundation Size 73 1 1 1 1 1 1 73<br />
Figure 7.9: Banded Parameter-based DSM of Elevator <strong>Design</strong> <strong>Process</strong>