10.02.2013 Views

Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE

Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE

Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MEASURING & CONTROL<br />

Optimized raw material usage driven by dynamic alloying<br />

State-<str<strong>on</strong>g>of</str<strong>on</strong>g>-<str<strong>on</strong>g>the</str<strong>on</strong>g>-art casthouse producti<strong>on</strong> management<br />

Dieter Deutz, PSI Metals N<strong>on</strong> Ferrous GmbH<br />

Increasing raw material and scrap prices<br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> n<strong>on</strong>-ferrous industry are leading<br />

to a c<strong>on</strong>tinually rising porti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> material<br />

costs in overall producti<strong>on</strong> costs. The<br />

effect <str<strong>on</strong>g>of</str<strong>on</strong>g> optimized raw material usage<br />

is getting more and more important to<br />

manage producti<strong>on</strong> costs and to ensure<br />

competitive advantages. PSImetals, <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

producti<strong>on</strong> management soluti<strong>on</strong> specialized<br />

for <str<strong>on</strong>g>the</str<strong>on</strong>g> needs <str<strong>on</strong>g>of</str<strong>on</strong>g> n<strong>on</strong> ferrous metals<br />

producers, takes this into account by recalculating<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> charging for all scheduled<br />

melt batches giving an overall optimized<br />

decisi<strong>on</strong> support for <str<strong>on</strong>g>the</str<strong>on</strong>g> resp<strong>on</strong>sible pers<strong>on</strong>s.<br />

The PSI system supports all aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong><br />

management. This includes a knowledge<br />

based order dressing comp<strong>on</strong>ent to manage<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> highest value <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> know-how.<br />

The sales and operati<strong>on</strong>al planning, due date<br />

quoting and order related producti<strong>on</strong> planning<br />

processes are covered as well as scheduling<br />

and executi<strong>on</strong>. All comp<strong>on</strong>ents are directly<br />

integrated in <strong>on</strong>e comm<strong>on</strong> factory model. This<br />

makes it possible to combine <str<strong>on</strong>g>the</str<strong>on</strong>g> as-is-situati<strong>on</strong><br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> short term and even <str<strong>on</strong>g>the</str<strong>on</strong>g> l<strong>on</strong>g term<br />

decisi<strong>on</strong> model.<br />

On executing level starting with <str<strong>on</strong>g>the</str<strong>on</strong>g> goods<br />

receipt, all material flows are not <strong>on</strong>ly tracked<br />

but c<strong>on</strong>trolled. Excavators, wheel loaders<br />

and fork-lift trucks and its weighing systems<br />

are integrated by mobile computers. Melting,<br />

holding, casting and all o<str<strong>on</strong>g>the</str<strong>on</strong>g>r equipments are<br />

directly c<strong>on</strong>ducted by level 2 integrati<strong>on</strong> and<br />

pdc terminals. So all producti<strong>on</strong> processes are<br />

guided and every time <strong>on</strong>line transparent.<br />

PSImetals with its simple and intuitive human<br />

interface is leading to short term implementati<strong>on</strong><br />

and direct acceptance. The real time c<strong>on</strong>necti<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> actual analysis measurement<br />

during melting for <str<strong>on</strong>g>the</str<strong>on</strong>g> optimizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

batch compositi<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> subsequent alloy<br />

takes into account <str<strong>on</strong>g>the</str<strong>on</strong>g> furnace sump, lumpiness<br />

and many o<str<strong>on</strong>g>the</str<strong>on</strong>g>r aspects leads to highest<br />

quality with lowest material costs. Each material<br />

unit is tracked from <str<strong>on</strong>g>the</str<strong>on</strong>g> ingredients to <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

final product.<br />

The PSI System delivers <str<strong>on</strong>g>the</str<strong>on</strong>g> current stocks,<br />

and knows <str<strong>on</strong>g>the</str<strong>on</strong>g> planned scrap inflow. The<br />

proactive c<strong>on</strong>trol <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> compositi<strong>on</strong> optimizati<strong>on</strong><br />

uses this knowledge to form follow-up<br />

charges, and thus achieve significantly lower<br />

usage <str<strong>on</strong>g>of</str<strong>on</strong>g> new material and at <str<strong>on</strong>g>the</str<strong>on</strong>g> same time<br />

lower scrap stocks at lower costs.<br />

The tracking and optimizing <str<strong>on</strong>g>of</str<strong>on</strong>g> energy c<strong>on</strong>sumpti<strong>on</strong><br />

as basis for smarter energy procurement<br />

is also already possible.<br />

This text gives an overview <str<strong>on</strong>g>of</str<strong>on</strong>g> how to optimize<br />

material flows within <str<strong>on</strong>g>aluminium</str<strong>on</strong>g> casthouses<br />

by using a holistic producti<strong>on</strong> management<br />

system.<br />

Casthouse producti<strong>on</strong> management<br />

Main cost drivers <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> costs in<br />

an <str<strong>on</strong>g>aluminium</str<strong>on</strong>g> casthouse are raw material and<br />

energy costs. Both topics are addressed by<br />

PSImetals Producti<strong>on</strong> Management System<br />

(PMS).<br />

To reach targets like<br />

Minimize material and energy costs<br />

• Optimize scrap usage by integrated<br />

alloying<br />

• C<strong>on</strong>trol number <str<strong>on</strong>g>of</str<strong>on</strong>g> alloying steps<br />

• Track and plan energy c<strong>on</strong>sumpti<strong>on</strong><br />

Secure and optimize producti<strong>on</strong> processes,<br />

especially alloying<br />

• Integrated testing device and alloying<br />

recalculati<strong>on</strong><br />

• C<strong>on</strong>trol deviati<strong>on</strong> handling by customer<br />

managed workflows<br />

• Tool management<br />

Real time transparency & material genealogy<br />

• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all relevant events<br />

• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all material items<br />

• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> material genealogy<br />

first <str<strong>on</strong>g>of</str<strong>on</strong>g> all real time transparency is needed by<br />

driving and supporting <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> processes.<br />

Step 1 – material management<br />

and material flow c<strong>on</strong>trol<br />

The fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r approaches are explained based<br />

<strong>on</strong> a casthouse example which is shown in<br />

Fig. 1:<br />

Fig. 1: Areas <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> within a casthouse<br />

Beginning with a scrap and metal stockyard<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> casthouse examples c<strong>on</strong>sist <str<strong>on</strong>g>of</str<strong>on</strong>g> melting<br />

furnaces, casting, sawing, homogenizati<strong>on</strong> and<br />

scalping devices. PSImetals covers all types<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> casthouses. The example should point out<br />

high complexity in different alloys and dimensi<strong>on</strong>s<br />

especially when casting ingots and billets<br />

is not limited.<br />

Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all types <str<strong>on</strong>g>of</str<strong>on</strong>g> materials is essential<br />

for <str<strong>on</strong>g>the</str<strong>on</strong>g> fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r steps. The starting point is<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> material input in <str<strong>on</strong>g>the</str<strong>on</strong>g> factory. On basis <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

notificati<strong>on</strong>s and purchase orders <str<strong>on</strong>g>the</str<strong>on</strong>g> input is<br />

booked and <str<strong>on</strong>g>the</str<strong>on</strong>g> material is ready for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />

qualificati<strong>on</strong> and/or preparati<strong>on</strong> steps. Each<br />

movement is driven by PSImetals to ensure<br />

that every material is a <str<strong>on</strong>g>the</str<strong>on</strong>g> right positi<strong>on</strong> in<br />

accordance to <str<strong>on</strong>g>the</str<strong>on</strong>g> schedules. At each workplace<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> corresp<strong>on</strong>ding schedule gives <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

workers <str<strong>on</strong>g>the</str<strong>on</strong>g>ir program for <str<strong>on</strong>g>the</str<strong>on</strong>g> shift. By activating<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> next task related transport orders<br />

for forklifts, cranes or fully automatic handling<br />

devices are generated.<br />

This principle <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>trolling and driving<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> material movements, tracking <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong><br />

and <str<strong>on</strong>g>the</str<strong>on</strong>g> as-is values <str<strong>on</strong>g>of</str<strong>on</strong>g> each material unit is<br />

not <strong>on</strong>ly valid for raw materials (RM), but<br />

also for work in process (WIP), semi-finished<br />

goods (SFG) and finished goods (FG).<br />

PSImetals provides all needed customizing<br />

functi<strong>on</strong>ality to make all adopti<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> customer<br />

situati<strong>on</strong> as easy as possible. As an example<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> built in editor for <str<strong>on</strong>g>the</str<strong>on</strong>g> yard topology<br />

is menti<strong>on</strong>ed. With this editor <str<strong>on</strong>g>the</str<strong>on</strong>g> customer<br />

can change his structure directly without any<br />

programming. This is in <str<strong>on</strong>g>the</str<strong>on</strong>g> casthouse area<br />

used to change <str<strong>on</strong>g>the</str<strong>on</strong>g> structure <str<strong>on</strong>g>of</str<strong>on</strong>g> boxes in according<br />

to <str<strong>on</strong>g>the</str<strong>on</strong>g> product mix and <str<strong>on</strong>g>the</str<strong>on</strong>g> procurement<br />

strategy.<br />

Step 2 – integrated dynamic alloying<br />

Based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> sufficient transparency <str<strong>on</strong>g>the</str<strong>on</strong>g> real<br />

benefits are achieved by using <str<strong>on</strong>g>the</str<strong>on</strong>g> built-in al-<br />

26 <strong>ALU</strong>MINIUM · EAC CONGRESS 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!