Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE
Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE
Influence of the natural aluminium oxide layer on ... - ALU-WEB.DE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MEASURING & CONTROL<br />
Optimized raw material usage driven by dynamic alloying<br />
State-<str<strong>on</strong>g>of</str<strong>on</strong>g>-<str<strong>on</strong>g>the</str<strong>on</strong>g>-art casthouse producti<strong>on</strong> management<br />
Dieter Deutz, PSI Metals N<strong>on</strong> Ferrous GmbH<br />
Increasing raw material and scrap prices<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> n<strong>on</strong>-ferrous industry are leading<br />
to a c<strong>on</strong>tinually rising porti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> material<br />
costs in overall producti<strong>on</strong> costs. The<br />
effect <str<strong>on</strong>g>of</str<strong>on</strong>g> optimized raw material usage<br />
is getting more and more important to<br />
manage producti<strong>on</strong> costs and to ensure<br />
competitive advantages. PSImetals, <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
producti<strong>on</strong> management soluti<strong>on</strong> specialized<br />
for <str<strong>on</strong>g>the</str<strong>on</strong>g> needs <str<strong>on</strong>g>of</str<strong>on</strong>g> n<strong>on</strong> ferrous metals<br />
producers, takes this into account by recalculating<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> charging for all scheduled<br />
melt batches giving an overall optimized<br />
decisi<strong>on</strong> support for <str<strong>on</strong>g>the</str<strong>on</strong>g> resp<strong>on</strong>sible pers<strong>on</strong>s.<br />
The PSI system supports all aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong><br />
management. This includes a knowledge<br />
based order dressing comp<strong>on</strong>ent to manage<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> highest value <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> know-how.<br />
The sales and operati<strong>on</strong>al planning, due date<br />
quoting and order related producti<strong>on</strong> planning<br />
processes are covered as well as scheduling<br />
and executi<strong>on</strong>. All comp<strong>on</strong>ents are directly<br />
integrated in <strong>on</strong>e comm<strong>on</strong> factory model. This<br />
makes it possible to combine <str<strong>on</strong>g>the</str<strong>on</strong>g> as-is-situati<strong>on</strong><br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> short term and even <str<strong>on</strong>g>the</str<strong>on</strong>g> l<strong>on</strong>g term<br />
decisi<strong>on</strong> model.<br />
On executing level starting with <str<strong>on</strong>g>the</str<strong>on</strong>g> goods<br />
receipt, all material flows are not <strong>on</strong>ly tracked<br />
but c<strong>on</strong>trolled. Excavators, wheel loaders<br />
and fork-lift trucks and its weighing systems<br />
are integrated by mobile computers. Melting,<br />
holding, casting and all o<str<strong>on</strong>g>the</str<strong>on</strong>g>r equipments are<br />
directly c<strong>on</strong>ducted by level 2 integrati<strong>on</strong> and<br />
pdc terminals. So all producti<strong>on</strong> processes are<br />
guided and every time <strong>on</strong>line transparent.<br />
PSImetals with its simple and intuitive human<br />
interface is leading to short term implementati<strong>on</strong><br />
and direct acceptance. The real time c<strong>on</strong>necti<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> actual analysis measurement<br />
during melting for <str<strong>on</strong>g>the</str<strong>on</strong>g> optimizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
batch compositi<strong>on</strong> and <str<strong>on</strong>g>the</str<strong>on</strong>g> subsequent alloy<br />
takes into account <str<strong>on</strong>g>the</str<strong>on</strong>g> furnace sump, lumpiness<br />
and many o<str<strong>on</strong>g>the</str<strong>on</strong>g>r aspects leads to highest<br />
quality with lowest material costs. Each material<br />
unit is tracked from <str<strong>on</strong>g>the</str<strong>on</strong>g> ingredients to <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
final product.<br />
The PSI System delivers <str<strong>on</strong>g>the</str<strong>on</strong>g> current stocks,<br />
and knows <str<strong>on</strong>g>the</str<strong>on</strong>g> planned scrap inflow. The<br />
proactive c<strong>on</strong>trol <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> compositi<strong>on</strong> optimizati<strong>on</strong><br />
uses this knowledge to form follow-up<br />
charges, and thus achieve significantly lower<br />
usage <str<strong>on</strong>g>of</str<strong>on</strong>g> new material and at <str<strong>on</strong>g>the</str<strong>on</strong>g> same time<br />
lower scrap stocks at lower costs.<br />
The tracking and optimizing <str<strong>on</strong>g>of</str<strong>on</strong>g> energy c<strong>on</strong>sumpti<strong>on</strong><br />
as basis for smarter energy procurement<br />
is also already possible.<br />
This text gives an overview <str<strong>on</strong>g>of</str<strong>on</strong>g> how to optimize<br />
material flows within <str<strong>on</strong>g>aluminium</str<strong>on</strong>g> casthouses<br />
by using a holistic producti<strong>on</strong> management<br />
system.<br />
Casthouse producti<strong>on</strong> management<br />
Main cost drivers <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> costs in<br />
an <str<strong>on</strong>g>aluminium</str<strong>on</strong>g> casthouse are raw material and<br />
energy costs. Both topics are addressed by<br />
PSImetals Producti<strong>on</strong> Management System<br />
(PMS).<br />
To reach targets like<br />
Minimize material and energy costs<br />
• Optimize scrap usage by integrated<br />
alloying<br />
• C<strong>on</strong>trol number <str<strong>on</strong>g>of</str<strong>on</strong>g> alloying steps<br />
• Track and plan energy c<strong>on</strong>sumpti<strong>on</strong><br />
Secure and optimize producti<strong>on</strong> processes,<br />
especially alloying<br />
• Integrated testing device and alloying<br />
recalculati<strong>on</strong><br />
• C<strong>on</strong>trol deviati<strong>on</strong> handling by customer<br />
managed workflows<br />
• Tool management<br />
Real time transparency & material genealogy<br />
• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all relevant events<br />
• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all material items<br />
• Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> material genealogy<br />
first <str<strong>on</strong>g>of</str<strong>on</strong>g> all real time transparency is needed by<br />
driving and supporting <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> processes.<br />
Step 1 – material management<br />
and material flow c<strong>on</strong>trol<br />
The fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r approaches are explained based<br />
<strong>on</strong> a casthouse example which is shown in<br />
Fig. 1:<br />
Fig. 1: Areas <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> within a casthouse<br />
Beginning with a scrap and metal stockyard<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> casthouse examples c<strong>on</strong>sist <str<strong>on</strong>g>of</str<strong>on</strong>g> melting<br />
furnaces, casting, sawing, homogenizati<strong>on</strong> and<br />
scalping devices. PSImetals covers all types<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> casthouses. The example should point out<br />
high complexity in different alloys and dimensi<strong>on</strong>s<br />
especially when casting ingots and billets<br />
is not limited.<br />
Tracking <str<strong>on</strong>g>of</str<strong>on</strong>g> all types <str<strong>on</strong>g>of</str<strong>on</strong>g> materials is essential<br />
for <str<strong>on</strong>g>the</str<strong>on</strong>g> fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r steps. The starting point is<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> material input in <str<strong>on</strong>g>the</str<strong>on</strong>g> factory. On basis <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
notificati<strong>on</strong>s and purchase orders <str<strong>on</strong>g>the</str<strong>on</strong>g> input is<br />
booked and <str<strong>on</strong>g>the</str<strong>on</strong>g> material is ready for fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />
qualificati<strong>on</strong> and/or preparati<strong>on</strong> steps. Each<br />
movement is driven by PSImetals to ensure<br />
that every material is a <str<strong>on</strong>g>the</str<strong>on</strong>g> right positi<strong>on</strong> in<br />
accordance to <str<strong>on</strong>g>the</str<strong>on</strong>g> schedules. At each workplace<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> corresp<strong>on</strong>ding schedule gives <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
workers <str<strong>on</strong>g>the</str<strong>on</strong>g>ir program for <str<strong>on</strong>g>the</str<strong>on</strong>g> shift. By activating<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> next task related transport orders<br />
for forklifts, cranes or fully automatic handling<br />
devices are generated.<br />
This principle <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>trolling and driving<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> material movements, tracking <str<strong>on</strong>g>the</str<strong>on</strong>g> locati<strong>on</strong><br />
and <str<strong>on</strong>g>the</str<strong>on</strong>g> as-is values <str<strong>on</strong>g>of</str<strong>on</strong>g> each material unit is<br />
not <strong>on</strong>ly valid for raw materials (RM), but<br />
also for work in process (WIP), semi-finished<br />
goods (SFG) and finished goods (FG).<br />
PSImetals provides all needed customizing<br />
functi<strong>on</strong>ality to make all adopti<strong>on</strong>s to <str<strong>on</strong>g>the</str<strong>on</strong>g> customer<br />
situati<strong>on</strong> as easy as possible. As an example<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> built in editor for <str<strong>on</strong>g>the</str<strong>on</strong>g> yard topology<br />
is menti<strong>on</strong>ed. With this editor <str<strong>on</strong>g>the</str<strong>on</strong>g> customer<br />
can change his structure directly without any<br />
programming. This is in <str<strong>on</strong>g>the</str<strong>on</strong>g> casthouse area<br />
used to change <str<strong>on</strong>g>the</str<strong>on</strong>g> structure <str<strong>on</strong>g>of</str<strong>on</strong>g> boxes in according<br />
to <str<strong>on</strong>g>the</str<strong>on</strong>g> product mix and <str<strong>on</strong>g>the</str<strong>on</strong>g> procurement<br />
strategy.<br />
Step 2 – integrated dynamic alloying<br />
Based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> sufficient transparency <str<strong>on</strong>g>the</str<strong>on</strong>g> real<br />
benefits are achieved by using <str<strong>on</strong>g>the</str<strong>on</strong>g> built-in al-<br />
26 <strong>ALU</strong>MINIUM · EAC CONGRESS 2011