11.07.2015 Views

Catalyst Sun Blade Computer Upgrade Manual - Zzybot.net

Catalyst Sun Blade Computer Upgrade Manual - Zzybot.net

Catalyst Sun Blade Computer Upgrade Manual - Zzybot.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installing the <strong>Sun</strong> <strong>Blade</strong> 2500 Test <strong>Computer</strong> (Upgrading from CPU-24)Install the Outlet StripIf the system is being upgraded from an Ultra 10/60 test computer, proceed toInstalling the <strong>Sun</strong> <strong>Blade</strong> 2500 Test <strong>Computer</strong> (Upgrading from Ultra 10/60).If the system is being upgraded from a CPU-24,install the <strong>Sun</strong> <strong>Blade</strong> 2500 testcomputer, as described in the following steps. This section describes how toinstall the NETGEAR Ether<strong>net</strong> switch.This section is composed of thefollowing subsections:• Install the Outlet Strip• Install the Power Supply Assembly• Install the <strong>Sun</strong> <strong>Blade</strong> 2500 <strong>Computer</strong> Mounting Sled• Install the <strong>Sun</strong> <strong>Blade</strong> 2500 Test <strong>Computer</strong>• Connect the <strong>Sun</strong> <strong>Blade</strong> 2500 CablesOutlet Strip and Upper Strut1) Install the outlet strip assembly from the operator side using two #10-32screws (470-296-01) at the upper most mounting hole on the modulemounting cage and nut bar location 2. See the figure Power SupplyAssembly.2) Torque the two screws to 30 in-lbs.3) Plug the outlet strip power cable into an unswitched J9 connection (A orB) of the main vault.4) Connect the Ether<strong>net</strong> switch power cord to the outlet strip.<strong>Catalyst</strong> <strong>Sun</strong> <strong>Blade</strong> <strong>Computer</strong> <strong>Upgrade</strong> <strong>Manual</strong> 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!