13.11.2012 Aufrufe

Schienenverkehr – sicher, leise, effizient - (IRT) der RWTH Aachen

Schienenverkehr – sicher, leise, effizient - (IRT) der RWTH Aachen

Schienenverkehr – sicher, leise, effizient - (IRT) der RWTH Aachen

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Safety at passenger exchange<br />

3 Prevention of slipping on platform<br />

3 Gap protection measures<br />

3 Dependence of door closing and train<br />

movement<br />

3 Reverse of door closure<br />

3 Locking of doors/ windows<br />

3 Prevention of falling of person<br />

3 Announcement of door closure<br />

3 Limitation of kinetic energy during door<br />

closure<br />

3 Detection of obstacle/ person in door and<br />

stoppage of door closing<br />

3 Selective release of door locking /lighting<br />

of platform<br />

3 Maintenance of RS (excl. barriers)<br />

3 Maintenance of objects of infrastructure<br />

(excl. barriers)<br />

3 Maintenance of platform and platform<br />

equipment<br />

Human attention<br />

3 Human attention wayside staff<br />

3 Human attention TD<br />

3 Human attention (TD on LC)<br />

3 Human attention: TD, knowledge of route<br />

& brake application<br />

3 Human attention train attendant<br />

Route safety<br />

3 One-directional track operation<br />

3 Protection against entering track<br />

3 Flank protection<br />

3 Immobilisation of train<br />

3 Track occupancy detection<br />

Abb. 4: Liste <strong>der</strong> Barrieren (Auszug)<br />

Abb. 5: Liste <strong>der</strong> Neutralisierenden Faktoren NF<br />

ROSA <strong>–</strong> Optimierende Sicherheitsanalyse System Bahn<br />

Single coach train | Marginal dimension and mass of object | Sufficient distance between CE and obstacle/ installation/ buildings | Suffi-<br />

cient distance between train gauge and object | Second rail keeps train guiding | (Broken) element keeps its position | Dispatcher sets<br />

up route for vehicles in or<strong>der</strong> to minimise damages | Setup or route without conflicts | No flanking train | No head on train | No<br />

presence of maintenance train | No approach of (next) train | No presence of train | No preceding train | Low speed diffe-<br />

rence | Low speed on train | No standing vehicle<br />

Mitigation of toxic substances | No critical voltage impacts on person | No exposure of person in hazardous area | Human attention (pas-<br />

senger, third) | No person on platform | No passenger in train | (Self-) rescue of person | Passenger keeps sitting | No road user on<br />

LC | Road user leaves LC in time | Vehicle rolls out | Local staff stops vehicle | No switch command (no moving switch) | Trailable<br />

points | Track without catenary | Track without gradient | No obstacle on track | Sufficient radius of curvature | NF: adequate visi-<br />

bility conditions (climate, no dusk, …)<br />

Umsetzung des Modells in ein rechnergestütztes<br />

Werkzeug<br />

Ziele dieser Arbeiten sind:<br />

3 Kopplung <strong>der</strong> Unfallereignisse mit generischen<br />

Gefährdungen als Ursache mithilfe von Ereignisbäumen<br />

3 Schaffung einer rechnergestützten Matrixstruktur<br />

zur Verknüpfung von Eintretenswahrscheinlichkeiten<br />

von Gefährdungen und den Versagens-<br />

Train protection; safe movement of train<br />

3 Overspeed protection<br />

3 Speed limit indication<br />

3 Protection against exceeding operational<br />

danger point<br />

3 Speed restriction<br />

3 Onboard survey of train integrity<br />

3 Initial survey of train<br />

3 Wayside survey of train systems<br />

3 Onboard survey of train systems<br />

3 Onboard hot box detection<br />

3 Wayside hot box detection<br />

3 Limitation of suspension<br />

3 High mass of train<br />

3 Discovery of train detection failure<br />

3 Replication of train position<br />

3 Disposition of train<br />

3 Setup of safe route; Generation of MA<br />

(interlocking system)<br />

3 Unambiguous transmission/ display of MA<br />

to train driver<br />

3 Correct interpretation of transmitted MA<br />

3 Dependence of routes/ signals/ route logic<br />

3 Approach locking (incl. detection of train<br />

approach)<br />

3 Time buffer according to train approach<br />

3 Check of end position of switch<br />

Separation of road and track<br />

3 Activation of train announcement on LC;<br />

separation of road user and train<br />

3 Check of LC protection<br />

3 LC monitoring<br />

Guiding function of track; compliance<br />

with clearance envelope<br />

3 Broken rail detection<br />

3 Detection of irregular track conditions<br />

3 Supplementary guiding of wheel<br />

3 Compliance with loading gauge<br />

and distribution of mass<br />

3 Storm warning<br />

3 Protection against crosswind sensibility<br />

3 Detection of obstacle on track/ within CE<br />

Safe transportation of passenger and<br />

loading<br />

3 Fixation of movable elements<br />

3 Closure of dangerous zone<br />

3 Isolation of heat source and environment<br />

3 Control and supervision of temperature<br />

3 Control of air mixture<br />

3 Limitation of jerk<br />

3 Permanently coupled cars<br />

3 Compliance with regulations and rules<br />

concerning integrity of personal health<br />

Protection against intrusion of person<br />

into clearance envelope<br />

3 Prevention of intrusion into CE (outside<br />

platform)<br />

3 Prevention of intrusion into CE platform<br />

3 Prevention of intrusion into dangerous<br />

area (platform edge)<br />

3 Detection of intrusion into CE platform<br />

3 Ensure safe crossings of track<br />

3 Ensure (self-)rescue near CE<br />

3 Trainside announcement of train approach<br />

3 Wayside announcement of train approach<br />

3 Announcement of train approach at<br />

platform<br />

3 Announcement of train approach on<br />

closed track<br />

3 Wayside recognisability of RS<br />

3 Report of person on track and closure of<br />

track<br />

wahrscheinlichkeiten von Sicherheitseinrichtungen<br />

unter Berücksichtigung <strong>der</strong> Verzweigungs-<br />

wahrscheinlichkeiten (im Sinne <strong>der</strong> Aufteilungs-<br />

parameter) in den relevanten Ästen <strong>der</strong> Ereig-<br />

nisbäume<br />

3 Erstellen <strong>der</strong> Datenstrukturen mit Berücksichtigung<br />

<strong>der</strong> Strukturen vorhandener Datenbanken<br />

3 Erstellung von Schnittstellen zu Eingaben aller<br />

relevanten Parameter für MS-Excel-Anwendungen<br />

13

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!