Qualification of the Assembly Process of Flip-Chip BGA Packages ...
Qualification of the Assembly Process of Flip-Chip BGA Packages ...
Qualification of the Assembly Process of Flip-Chip BGA Packages ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cleaning<br />
Texas Tech University, Nivetha Shivan, May 2012<br />
De-ionized water ultrasonic cleaner is used for ultrasonic (38 kHz) cleaning for minimum<br />
15 minutes. This ensures devices are cleaned and are free <strong>of</strong> flux residues.<br />
Drying<br />
The units are subjected to drying for 5 minutes at 125 deg C or at room temperature until<br />
dry. This ensures devices are dry prior to electrical tests.<br />
Visual inspection: The units are visually inspected which helps check for damage during<br />
reflow process.<br />
5.1.1.3 CSAM after MSL pre-conditioning<br />
CSAM analysis is performed on <strong>the</strong> devices to check for any delaminations/voids in <strong>the</strong><br />
package.<br />
5.1.1.4 Temperature Cycling and Pressure Cooker Test<br />
Following MSL, <strong>the</strong> units are subjected to stress tests like temperature cycling and<br />
pressure cooker test. The read points for temperature cycling were after 500 cycles and<br />
1000 cycles. Similarly, <strong>the</strong> read points for pressure cooker tests were after 168 hours and<br />
288 hours.<br />
5.1.1.5 Final Measurements<br />
Visual examination and CSAM analysis are performed on <strong>the</strong> devices.<br />
5.1.1.6 Shadow Moiré Test<br />
The warpage <strong>of</strong> <strong>the</strong> package was measured on <strong>the</strong> substrate surface. These measurements<br />
are conducted at following temperatures: 25°C, 100°C, 150°C, 183°C, 200°C, 220°C,<br />
240°C, 260°C, 240°C, 220°C, 200°C, 183°C, 150°C, 100°C, and 25°C.<br />
50