Initial Inspection and Electrical Verification<br />

Texas Tech University, Nivetha Shivan, May 2012<br />

The devices from TV1~4 underwent C-SAM analysis and <strong>the</strong>re was no delaminations or<br />

voids that were found. These images could be used as reference images for comparing <strong>the</strong><br />

results after pre-conditioning and temperature cycling stress tests to understand what<br />

caused <strong>the</strong> failure, if any. All devices PASSED electrical test that was done after C-SAM<br />

analysis.<br />

MSL3 Pre-conditioning Results<br />

120 devices per TV were subjected to MSL3 pre-conditioning process according to <strong>the</strong><br />

qualification plan. These devices were tested electrically and analyzed using acoustic<br />

microscopy and found to PASS without any electrical failures or anomalies in <strong>the</strong> CSAM<br />

images.<br />

Temperature Cycling Results<br />

30 devices per TV out <strong>of</strong> <strong>the</strong> 120 from <strong>the</strong> MSL3 lots were subjected to temperature<br />

cycling (JEDEC condition C) for 300 cycles which is <strong>the</strong> conditional qualification read<br />

point. Following which, <strong>the</strong>y were electrically tested. The devices were <strong>the</strong>n subjected to<br />

200 additional cycles which defines <strong>the</strong> full qualification read point and ano<strong>the</strong>r 500<br />

additional cycles which makes <strong>the</strong> FYI read point. Similarly, 30 devices went through<br />

Pressure cooker tests and were electrically tested at <strong>the</strong> three read points – 96 hours, 168<br />

hours and 288 hours. Tables 6.6, 6.7 and 6.8 show electrical test results post MSL3, TCT<br />

and PCT.<br />

Table 6.6: Electrical Test Results Post MSL3<br />