5.2 Pre-engineering <strong>Qualification</strong> Phase II<br />

Texas Tech University, Nivetha Shivan, May 2012<br />

The difference between Phase I and Phase II being <strong>the</strong> electrical characteristics, <strong>the</strong><br />

devices are also checked for <strong>the</strong>ir electrical functionality at time-zero, after MSL3 pre-<br />

conditioning, after 300 cycles <strong>of</strong> temperature, 500 cycles <strong>of</strong> temperature and 1000 cycles<br />

<strong>of</strong> temperature. These read points after temperature cycling called as conditional<br />

qualification, full qualification and robustness check (FYI) respectively, are important in<br />

that <strong>the</strong>y help us determine when <strong>the</strong> failures occurred. The conditional qual, full qual<br />

and FYI read points for Pressure Cooker test are 96 hours, 168 hours and 288 hours<br />

respectively.<br />