24.02.2013 Views

Qualification of the Assembly Process of Flip-Chip BGA Packages ...

Qualification of the Assembly Process of Flip-Chip BGA Packages ...

Qualification of the Assembly Process of Flip-Chip BGA Packages ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Texas Tech University, Nivetha Shivan, May 2012<br />

plan listed in Table 3.3. It is necessary to subject <strong>the</strong>se 4 TVs to <strong>the</strong> remaining stresses<br />

and correlate <strong>the</strong> decisions made from each step. It is only conclusive when a final<br />

decision is made based on <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> all <strong>of</strong> <strong>the</strong> stress tests.<br />

Lastly, TV3 also needs to pass <strong>the</strong> Engineering <strong>Qualification</strong> which uses <strong>the</strong> actual<br />

product die with higher speed. Engineering <strong>Qualification</strong> has a similar stress test plan as<br />

<strong>the</strong> Pre-engineering <strong>Qualification</strong> and also has essential read points. This way one<br />

variable is introduced at each <strong>Qualification</strong> step which will lead to a number <strong>of</strong> cycles <strong>of</strong><br />

learning before we qualify <strong>the</strong> new interconnect technology for <strong>the</strong> new product.<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!