Training Manual on Energy Efficiency - APO Asian Productivity ...
Training Manual on Energy Efficiency - APO Asian Productivity ...
Training Manual on Energy Efficiency - APO Asian Productivity ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Annex<br />
S.<br />
No.<br />
Enc<strong>on</strong>omic<br />
Opportunity<br />
1. Soft Starters<br />
<strong>Energy</strong> Savers<br />
2. Variable<br />
Speed Drives<br />
(Hydraulic/eddy<br />
current type)<br />
3. Maximum<br />
Demand<br />
c<strong>on</strong>troller<br />
SME energy efficiency opportunities assessment checklist<br />
4. Capacitor and<br />
auto PF c<strong>on</strong>trols:<br />
5. Electr<strong>on</strong>ic timers<br />
for machineries<br />
and lighting<br />
6. Variable<br />
frequency drive<br />
(Electr<strong>on</strong>ic)<br />
7. Permanent<br />
magnet motor for<br />
variable speed<br />
applicati<strong>on</strong>s<br />
Applicability<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Applicable/<br />
Not Applicable<br />
Estimated<br />
<strong>Energy</strong><br />
C<strong>on</strong>sumpti<strong>on</strong><br />
/hr (or any<br />
relevant<br />
energy<br />
indicator)<br />
by Existing<br />
Equipment<br />
- 124 -<br />
Hours of<br />
Operati<strong>on</strong><br />
/Day<br />
Nos.<br />
Estimated<br />
Potential for<br />
Savings<br />
(Order of<br />
magnitude of<br />
savings margin<br />
indicated in<br />
brackets)<br />
(3% of operating<br />
kW)<br />
(3–5 % of<br />
operating kW<br />
(Reducti<strong>on</strong> of<br />
demand charges)<br />
(1% <strong>on</strong> energy<br />
c<strong>on</strong>sumpti<strong>on</strong><br />
in terms of<br />
distributi<strong>on</strong> loss<br />
reducti<strong>on</strong>)<br />
(Direct savings<br />
-depends <strong>on</strong> the<br />
excess hours of<br />
operati<strong>on</strong> above<br />
prescribed time<br />
of operati<strong>on</strong>)<br />
(5–15% of<br />
operating kW<br />
(10–15%<br />
<strong>on</strong> average<br />
operating kW)<br />
(C<strong>on</strong>tinued <strong>on</strong> next page)