23.03.2013 Views

Training Manual on Energy Efficiency - APO Asian Productivity ...

Training Manual on Energy Efficiency - APO Asian Productivity ...

Training Manual on Energy Efficiency - APO Asian Productivity ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex<br />

S.<br />

No.<br />

Enc<strong>on</strong>omic<br />

Opportunity<br />

1. Soft Starters<br />

<strong>Energy</strong> Savers<br />

2. Variable<br />

Speed Drives<br />

(Hydraulic/eddy<br />

current type)<br />

3. Maximum<br />

Demand<br />

c<strong>on</strong>troller<br />

SME energy efficiency opportunities assessment checklist<br />

4. Capacitor and<br />

auto PF c<strong>on</strong>trols:<br />

5. Electr<strong>on</strong>ic timers<br />

for machineries<br />

and lighting<br />

6. Variable<br />

frequency drive<br />

(Electr<strong>on</strong>ic)<br />

7. Permanent<br />

magnet motor for<br />

variable speed<br />

applicati<strong>on</strong>s<br />

Applicability<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Applicable/<br />

Not Applicable<br />

Estimated<br />

<strong>Energy</strong><br />

C<strong>on</strong>sumpti<strong>on</strong><br />

/hr (or any<br />

relevant<br />

energy<br />

indicator)<br />

by Existing<br />

Equipment<br />

- 124 -<br />

Hours of<br />

Operati<strong>on</strong><br />

/Day<br />

Nos.<br />

Estimated<br />

Potential for<br />

Savings<br />

(Order of<br />

magnitude of<br />

savings margin<br />

indicated in<br />

brackets)<br />

(3% of operating<br />

kW)<br />

(3–5 % of<br />

operating kW<br />

(Reducti<strong>on</strong> of<br />

demand charges)<br />

(1% <strong>on</strong> energy<br />

c<strong>on</strong>sumpti<strong>on</strong><br />

in terms of<br />

distributi<strong>on</strong> loss<br />

reducti<strong>on</strong>)<br />

(Direct savings<br />

-depends <strong>on</strong> the<br />

excess hours of<br />

operati<strong>on</strong> above<br />

prescribed time<br />

of operati<strong>on</strong>)<br />

(5–15% of<br />

operating kW<br />

(10–15%<br />

<strong>on</strong> average<br />

operating kW)<br />

(C<strong>on</strong>tinued <strong>on</strong> next page)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!