5.5 TIPS FOR ENERGY-EFFICIENT ELECTRICAL LOAD MANAGEMENT<br />

• Review the tariff agreement with the utility supplier to meet requirements<br />

at optimum cost.<br />

• Balance kilowatt loads <strong>on</strong> three phases of supply.<br />

• Schedule plant operati<strong>on</strong>s to maintain a high load factor.<br />

• Shift loads to off-peak times where possible.<br />

• Minimize maximum demand by c<strong>on</strong>trolling loads through an automatic<br />

demand c<strong>on</strong>troller.<br />

• Stagger start-up times for equipment with large starting currents to<br />

minimize load peaking.<br />

• Use standby electric generati<strong>on</strong> equipment for <strong>on</strong>-peak high load periods.<br />

• Correct power factor to well above 0.90 by installing additi<strong>on</strong>al capacitors<br />

and automatic power factor c<strong>on</strong>trollers, avoid motor under-load c<strong>on</strong>diti<strong>on</strong>s,<br />

and take advantage of PF improvement incentives if any are available.<br />

• Ensure that all capacitors are in line and functi<strong>on</strong>al, by checking charging<br />

current.<br />

• Relocate transformers close to main loads.<br />

• Set transformer taps to optimum settings.<br />

• Disc<strong>on</strong>nect primary power to transformers that do not serve any active<br />

loads.<br />

• C<strong>on</strong>sider <strong>on</strong>-site captive generati<strong>on</strong> or cogenerati<strong>on</strong> as a cheaper/efficient<br />

alternative.<br />

• Export power to grid if there is any surplus in captive generati<strong>on</strong>.<br />

• Periodically, calliberate the utility’s electricity meter with your own meter<br />

for accuracy.<br />

• Shut off unnecessary and idle process equipment, utilities, and office<br />

equipment like computers, printers, and copiers at night.<br />

- 55 -<br />