27.03.2013 Views

personnel qualification standard (pqs) - I Marine Expeditionary ...

personnel qualification standard (pqs) - I Marine Expeditionary ...

personnel qualification standard (pqs) - I Marine Expeditionary ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Logistics Combat Element 107<br />

The OPP is a temporary task organization under the OPCON of the<br />

MAGTF commander. It consists of maintenance, embarkation <strong>personnel</strong>,<br />

and equipment operators from all MAGTF MSEs and the NSE. The OPP’s<br />

task is to prepare MPE/S for offload at the AAA.<br />

On activation, the OPP<br />

will<br />

deploy to join the MPS before sailing, during transit or when they<br />

arrive at the AAA. Ideally, the OPP should deploy to join the MPS at<br />

least<br />

96 hours before AAA closure. If this is not feasible, the OPP should be<br />

positioned in the AAA and board the MPS as soon as possible.<br />

The OPP consists of <strong>personnel</strong> from the MAGTF, NSE, naval embarked<br />

advisory team (NEAT), and designated force protection units. The OPP is<br />

embarked on the MPSRON by off-load day (O-day) minus 4 (O-4).<br />

The<br />

OPP disestablishes upon arrival of MPSs and on completion of<br />

offload preparations. Members remain aboard to form the nucleus of the<br />

debarkation team, augmented as required by MAGTF and NSE <strong>personnel</strong><br />

who arrive with the FIE.<br />

Follow-Up and Sustainment Shipping<br />

Follow-up shipping provides lift for additional critical items that are not in<br />

the MPS PO and could not be lifted as part of the FIE. Depending on the<br />

length of the MPF MAGTF<br />

employment mission, sustainment shipping<br />

will<br />

be coordinated to provide all classes of supply past the 30 days aboard<br />

the MPSRON.<br />

Air Movement<br />

Group Elements(FIE Organization)<br />

Air movement<br />

is a continuous, progressive operation that transports successive<br />

elements of the deploying<br />

force to the objective area.<br />

The total time<br />

required will depend on the number, type, and initial locations of<br />

forces to deploy, aircraft availability, range, and throughput<br />

considerations. Some<br />

critical low density/high demand and other sustainment items may be shipped by<br />

air.<br />

Survey, Liaison, and Reconnaissance Party (SLRP)<br />

A task organization formed from the MAGTF and Navy support element,<br />

which is introduced into the objective area prior to arrival of the fly-in<br />

echelon. The survey, liaison, and reconnaissance party conducts initial<br />

reconnaissance, establishes liaison with in theater authorities and initiates<br />

preparations for arrival of the main body of the FIE and<br />

the maritime<br />

prepositioning ships squadron<br />

The SLRP normally deploys to the AAA under the OPCON of the<br />

MAGTF. Early SLRP deployment assesses conditions and reports<br />

observations as soon as possible to the MAGTF and associated<br />

107-19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!