19.07.2013 Views

Volume 13 Number 1 - University of the Philippines College of Law

Volume 13 Number 1 - University of the Philippines College of Law

Volume 13 Number 1 - University of the Philippines College of Law

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

310<br />

National Administrative Register <strong>Volume</strong> <strong>13</strong>/1<br />

Adopted: 12 Dec. 2001<br />

(SGD.) PANTALEON D. ALVAREZ<br />

Secretary<br />

Department <strong>of</strong> Transportation and Communication<br />

(SGD.) JOSE D. LINA, JR.<br />

Secretary<br />

Department <strong>of</strong> Interior and Local Government<br />

(SGD.) SIMEON A. DATUMANONG<br />

Secretary<br />

Department <strong>of</strong> Public Works and Highways<br />

Signed in <strong>the</strong> presence <strong>of</strong>:<br />

(SGD.) EDGARDO M. ABENINA (SGD.) RENATO M. PAREDES<br />

Assistant Secretary Police Chief Superintendent<br />

Land Transportation Office Traffic Management Group<br />

Date Filed: 11 March 2002<br />

(SGD.) LINDA M. TEMPLO<br />

Director III<br />

Planning Service, DPWH<br />

--o0o--<br />

Department Order No. 50, s. 2002<br />

Approval <strong>of</strong> Design Plans Prepared by DPWH Consultants<br />

To expedite <strong>the</strong> implementation <strong>of</strong> infrastructure projects and to delineate <strong>the</strong> responsibility<br />

<strong>of</strong> Design Consultants in <strong>the</strong> event <strong>of</strong> failure <strong>of</strong> facilities and/or significant changes during<br />

construction due to faulty design, final plans prepared by Consultants will no longer be<br />

subjected to detailed review by <strong>the</strong> Bureau <strong>of</strong> Design and approval by <strong>the</strong> Secretary or<br />

Undersecretary concerned.<br />

Henceforth, <strong>the</strong> following guidelines shall be observed in <strong>the</strong> preparation and review <strong>of</strong><br />

design plans by Consultants:<br />

1. The design criteria and specifications shall be in accordance with <strong>the</strong> DPWH Design<br />

Guidelines, Criteria and Standards. The Consultants shall seek approval <strong>of</strong> <strong>the</strong> Bureau <strong>of</strong><br />

Design (BOD) for any deviation/modification <strong>the</strong>re<strong>of</strong>.<br />

2. Preliminary plans, design reports and cost estimates shall be submitted to <strong>the</strong> BOD, thru<br />

<strong>the</strong> DPWH Implementing Office, for review <strong>of</strong> <strong>the</strong> design concepts <strong>of</strong> <strong>the</strong> proposed structures/<br />

facilities. Final plans shall be prepared by <strong>the</strong> Consultants after considering <strong>the</strong> comments <strong>of</strong><br />

BOD. The plans shall incorporate <strong>the</strong> BOD comments.<br />

3. The final plans should indicate on each sheet <strong>the</strong> full name, signature, field <strong>of</strong> expertise<br />

and, if required, <strong>the</strong> PRC registration number and seal <strong>of</strong> <strong>the</strong> corresponding designer <strong>of</strong> <strong>the</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!