JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INFRASTRUCTURE<br />
Sector<br />
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
Present Shortfall /<br />
Problems 2006<br />
Water Supply • 62.54 MLD<br />
• 30 % (4.4 lacs) of<br />
population not covered<br />
by piped water lines<br />
• Water leaks in pipes &<br />
appurtenances<br />
• Inadequate flow &<br />
pressure<br />
• Poor raw water quality<br />
• Supply duration (hrs.) –<br />
5 hours/day<br />
• Misuse of community<br />
hand pumps<br />
Sector<br />
Present Shortfall /<br />
Problems 2006<br />
Sewerage • STP Capacity<br />
90.25mld<br />
• Area uncovered by<br />
sewerage system –<br />
17%<br />
• Badly silted,<br />
choked, damaged at<br />
number of places &<br />
overloaded<br />
• Discharge of<br />
untreated sewage<br />
into river<br />
• 10% of sewerage<br />
received by STPs is<br />
treated<br />
• Absence of public<br />
toilets & urinals<br />
Table 15.3: Analysis - WATER SUPPLY<br />
Problems / Requirement 2021<br />
Future Total<br />
• 489.4 MLD<br />
• Piped water<br />
supply required<br />
for additional<br />
population<br />
• Further decline<br />
in water pressure<br />
• Deterioration of<br />
water quality<br />
• Service duration<br />
may decrease<br />
Table 15.4: Analysis - SEWERAGE<br />
132<br />
MDP Consultants in association with Allianz Securities Ltd.<br />
• 551.94 MLD<br />
piped water<br />
needed<br />
• Strengthening<br />
/ renewal of<br />
water works<br />
needed<br />
Problems / Requirement 2021<br />
Future Total<br />
• Sewage to be<br />
treated would be<br />
313.12MLD<br />
• Provision of<br />
adequate number<br />
of STPs<br />
• Maintenance of<br />
existing sewerage<br />
system & STPs<br />
• Provision of<br />
community<br />
toilets in public<br />
areas<br />
• 428.90 MLD<br />
to be treated<br />
• Additional<br />
STPs<br />
• Additional<br />
Network<br />
• Public toilets<br />
Projects<br />
Proposed<br />
• Water Supply /<br />
Renewal Works<br />
• Water Supply<br />
Distribution<br />
Network<br />
• Construction of<br />
Pumping<br />
Stations and<br />
Water Works<br />
Projects<br />
Proposed<br />
• Argumentation<br />
of Sewerage<br />
System<br />
• Const. of STPs<br />
• Public Toilets &<br />
Urinals<br />
• Purchase of<br />
Modern<br />
Equipment for<br />
Desilting