JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
JNNURM - GANGAPEDIA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
City Development Plan for Agra City in the state of Uttar Pradesh under <strong>JNNURM</strong><br />
Table 15.20: Projects Cost estimate Urban Poverty and Slum<br />
S. No. Projects Proposed<br />
1 Development and improvement of basic services<br />
2 Construction of community toilets and bath<br />
3 Construction of community rooms/ child care centre<br />
4<br />
Construction of about 8500 houses / Financial assistance<br />
for improvement of shelter<br />
5 Provision of security tenure<br />
Total (LS) 480.85<br />
143<br />
MDP Consultants in association with Allianz Securities Ltd.<br />
Project Cost<br />
(in crores) Department<br />
480.85 DUDA<br />
It is also suggested that while talking up slum up gradation projects priority be assigned to<br />
those located in the vicinity of Taj and efforts should also be made to confer security tenure to<br />
the slum dwellers since about 92 per cent of them are owners.<br />
15.2.11 Capacity Building<br />
The capacities of the organizations involved in city development need to be upgraded. This is<br />
proposed to be done in terms of capacity building programmes specifically designed for each<br />
of the organizations involved. This would include training programmes, awareness building,<br />
computerization and hiring of short-term manpower.<br />
Table 15.21: Projects Cost estimate Capacity Building<br />
S. No. Projects Proposed<br />
Project Cost<br />
(in crores) Department<br />
1 Capacity Building 11.60 ANN<br />
15.3 SECTOR WISE PROJECT COST<br />
Total (LS) 11.60<br />
The sector wise project costs shows that maximum investment is required in roads and<br />
transportation sector (63.1 per cent) followed by water supply (11.5 per cent) and minimum<br />
investment in industrial sector (0.1 per cent). The table 15.21 shows the sector wise project<br />
costs. The investment plan for the various projects under each sector is given in Chapter 16.<br />
Table 15.22: Sector wise Projects Cost<br />
S. No. Sector Cost (in crore)<br />
SUB - MISSION I<br />
1 Industry 4.83<br />
2 Heritage & Tourism 52.50<br />
3 Water Supply 900.04<br />
4 Sewerage 763.13<br />
5 Storm Water Drainage 168.44<br />
6 Solid Waste Management 87.51